Notational Orders 2025-02-13
Docket No.: ER25-822-000; ER25-723-000
El Puente De Williamsburg, Inc. – Enlace Latino De Accion Climatica, Inc., et al.
D.C. Cir. No. 23-1333
Order on application to construct and operate a 220-foot, 10-inch pipeline at existing LNG terminal at the Port of San Juan in Puerto Rico. NFEnergía LLC, 184 FERC ¶ 61,061 (2023), order on reh’g, 186 FERC ¶ 61,078 (2024).
Order on application to construct and operate a 220-foot, 10-inch pipeline at existing LNG terminal at the Port of San Juan in Puerto Rico. NFEnergía LLC, 184 FERC ¶ 61,061 (2023), order on reh’g, 186 FERC ¶ 61,078 (2024).
Indianapolis Power Light Co. v. FERC
No. 18-2104 (7th Cir. filed 5/17/2018)Complaint whether MISO tariff properly accounts for available grid-scale battery storage devices; issues concerning compensation, dispatch, and participation. Indianapolis Power Light Co. v. Midcontinent Indep. Transm. Sys.