No. 19-1002 (D.C. Cir. filed 1/2/2019) Allocation of cost responsibility for regional and lower-voltage facilities included in the PJM Regional Transmission Expansion Plan. PJM Interconnection, L.L.C.,161 FERC ¶ 61,218 (2017), reh'g denied,165 FERC ¶ 61,078 (2018). Status: in abeyance

This page was last updated on September 14, 2020