D.C. No. 20-1449, et alOrder accepting proposed tariff revisions, to (1) identify and include Asset Management Projects within the existing planning procedures of Attachment M-3 of the PJM Tariff and (2) include procedures for the identification and planning for end-of-life needs  (EOL Needs).  PJM Interconnection, L.L.C. and American Transmission Systems Inc., 172 FERC ¶ 61,136 (2020), order on reh’g, 173 FERC ¶ 61,225 (2020).  Order rejecting PJM proposal to revise Schedule 6 of the Amended and Restated Operating Agreement to provide a structure for end-of-life (EOL)-driven transmission projects to be reviewed and developed under PJM’s Regional Transmission Expansion Plan.  PJM Interconnection, L.L.C., 173 FERC ¶ 61,242 (2020), order on reh’g, 176 FERC ¶ 61,053 (2021), reh’g denied by operation of law, 176 FERC ¶ 62,158 (2021).

This page was last updated on September 14, 2022