Skip Navigation
 
Federal Energy Regulatory Commission



Resources Filing Guidelines File CEII or Privileged Material

 
Text Size small medium large
Filing Form No. 715 Annual Transmission
Planning and Evaluation Report

The Form No. 715 is comprised of the following parts:

  • Part 1, Identification and Certification;
  • Part 2, Power Flow Base Cases;
  • Part 3, Transmitting Utility Maps and Diagrams;
  • Part 4, Transmission Planning Reliability Criteria;
  • Part 5, Transmission Planning Assessment Practices; and
  • Part 6, Evaluation of Transmission System Performance.

Part 1 contains basic contact information, and should be filed publically. Parts 2 through 6 contain CEII, and should be filed as such.