- 1. Introduction
- 2. Project Description
- 3. Design, Construction History and Performance
- 4. Standard Operating Procedure
- 5. Overpumping Protective Systems
- 6. December 14, 2005 Breach
- 7. Technical Cause of Breach
- 8. Conclusions
- Appendix A - IPOC Information Request Letter
- Appendix B - Event Chronology
- Appendix C - Early Project Correspondence (4.9 MB)
- Figures (2.8 MB)
- Full Report (5.4 MB)