Bobcat Gas Storage
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/15/2008, Docket: RP08-608-000, Status: Effective
Original Sheet No. 83 Original Sheet No. 83
GENERAL TERMS AND CONDITIONS
(Continued)
5. PRIORITY, INTERRUPTION OF SERVICE, AND OPERATIONAL FLOW ORDERS
(Continued)
5.5 Action Alerts and Operational Flow Orders (Continued)
(k) Unilateral Action: In the event that (l) Customer(s) or
point operator(s) does not respond to an OFO, or (2) the
actions taken thereunder are insufficient to correct the
system problem for which the OFO was issued, or (3) there is
insufficient time to carry out the procedures with respect
to OFOs, Bobcat may take unilateral action, including the
curtailment of firm service, to maintain the operational
integrity of Bobcat's system. For purposes of this Section,
the operational integrity of Bobcat's system shall encompass
the integrity of the physical system and the preservation of
physical assets and their performance, the overall operating
performance, the overall operating performance of the entire
physical system, as an entity, and the maintenance (on a
reliable and operationally sound basis) of total system
deliverability and the quality of Gas received and/or
delivered.