The staff of the Office of Energy Projects (OEP) have finalized the new “Chapter 12 – Water Conveyance” of its Engineering Guidelines for the Evaluation of Hydropower Projects. The purpose of this document is to provide guidance for the inspection, monitoring, and evaluation of the safety of water conveyance structures at hydropower projects.

Chapter 12 discusses the following:

  • Penstocks
  • Power Canals
  • Flumes
  • Tunnels

Water conveyances differ from dams in the fact that they typically traverse long distances. It is possible that a conveyance failure may go unnoticed by project personnel for a significant time. While each type of conveyance has specific failure modes and prudent defensive measures, a common theme is the need for project personnel to be able to identify a failure and be able to quickly take action to minimize the consequences of the failure.