Federal Energy Regulatory Commission
   
      Calendar of Events

      Note: When attending an event at FERC HQ, please allow enough time to go through security.
      Note: Transcripts of Commission Meetings, Scoping Sessions, Conferences and Hearings are available for a fee from
              Ace-Federal Reporters, Inc. at (202) 347-3700, prior to when they are posted in the respective dockets on FERC.gov.
FERC Seal
 
  Workshop November 5-6, 2019  
  Conferences - Workshop November 5-6, 2019
Event Name: Workshop
Start Date: Tuesday, November 05, 2019
End Date: Wednesday, November 06, 2019
Summary: Workshop regarding Grid-Enhancing Technologies (Docket No. AD19-19-000) (Washington, DC) (Free webcast)
Description: The purpose of this workshop is to discuss grid-enhancing technologies that increase the capacity, efficiency, or reliability of transmission facilities.Panelists and staff will discuss how grid-enhancing technologies are currently used in transmission planning and operations, the challenges to their deployment and implementation, and what the Commission can do regarding those challenges, including incentivizing or requiring the adoption of grid-enhancing technologies by utilities and RTOs/ISOs.These technologies include, but are not limited to:(1) power flow control and transmission switching equipment; (2) storage technologies, and (3) advanced line rating management technologies.Participants at this workshop will include representatives from utilities, RTOs/ISOs, technology vendors, researchers, and other interested parties.Further details and a formal agenda will be issued prior to the conference.

The conference will be held at:
    Commission headquarters,
    888 First Street, NE,
    Washington, DC 20426.


For more information about this workshop, please contact Samin Peirovi at Samin.Peirovi@ferc.gov or 202-502-8080. For information related to logistics, please contact Sarah McKinley at Sarah.Mckinley@ferc.gov or 202-502-8368.

A free live webcast is available for this meeting. All webcasts are archived for 3 months.
Title : Docket No. AD19-19-000
* Start Time : 8:45 a.m.
End Time : 5:00p.m.
Location : Washington, DC
Contact : Samin Peirovi
Contact Telephone : 202-502-8080
Registration : http://www.ferc.gov/whats-new/registration/11-06-19-form.asp
Contact Email : Samin.Peirovi@ferc.gov
Related Files:
Notice [PDF]
Supplemental Notice (Agenda) [PDF]
Final Agenda [PDF]
Dagle, PNNL, Comments [PDF]
Dagle, PNNL, Slides [PDF]
Ruiz, NewGrid [PDF]
McCall, Lindsey Comments [PDF]
McCall, Lindsey slides [PDF]
Bayless, NRECA [PDF]
Collins, Southern [PDF]
Hackman, Ameren [PDF]
Bose, Washington State University [PDF]
Webb, MISO [PDF]
Clarke, Duke Energy [PDF]
Kormos, Exelon, Panel 3 [PDF]
Enayati, National Grid [PDF]
Abhulimen, CPUC [PDF]
Kormos, Exelon, Panel 4 [PDF]
Gramlich, WATT [PDF]
Leovy, TAPS [PDF]
Hiorns, Hiorns Smart Energy [PDF]
Glazer, PJM [PDF]
Millar, CAISO [PDF]
Bowring, Monitoring Analytics [PDF]
Patton, Potomac Economics [PDF]
Kreikebaum, Smart Wires [PDF]
Wellinghoff, GridPolicy [PDF]
Jammalamadaka, Apex Clean Energy [PDF]
Wangen, WIRAB [PDF]
Bradish, AEP, Panel 2 [PDF]
Bradish, AEP, Panel 4 [PDF]
Harrison, MISO [PDF]
* All times are local