    Alabama Municipal Electric Authority v. FERC, No. 10-1141 (D.C. Cir. filed 6/28/2010)

      Denial of complaint that rates under the Southern Company open access transmission tariff fail to meet the Commission’s comparability standard. Alabama Municipal Electric Authority v. Alabama Power Co. and Southern Co. Services, Inc., 119 FERC ¶ 61,286 PDF (2007), reh’g denied, 131 FERC ¶ 61,101 PDF (2010). FERC Docket No. EL06-93
      Assigned to: Lona Perry, Beth Pacella
      Status: petition denied 12/13/2011


    American Electric Power Service Corp., et al. v. FERC, Nos. 03-1223, et al. (D.C. Cir., filed Aug. 1, 2003).
      Conditional acceptance of proposals by the various Alliance Companies to join either the Midwest ISO or PJM. Alliance Cos., et al., 100 FERC ¶ 61,137 PDF (2002), order on reh'g, 103 FERC ¶ 61,274 PDF (2003).
      FERC Docket No. ER03-765
      Assigned to: Beth Pacella
      Status: in abeyance


    American Electric Power Service Corp., et al. v. FERC, Nos. 04-1017, et al. (D.C. Cir., filed Jan. 14, 2004 and later)

      Rates for regional “through and out” service between Midwest ISO and PJM. Midwest Independent Transmission System Operator, et al., 104 FERC ¶ 61,105 PDF (2003), order on reh'g, 105 FERC ¶ 61,212 PDF (2003).
      FERC Docket Nos. EL02-111, et al.
      Assigned to: Beth Pacella
      Status: abeyance


    Arkansas Public Service Comm'n, et al. v. FERC, Nos. 08-1330, et al. (D.C. Cir. filed 10/14/2008 and later)

      Order on remand from Louisiana Public Service Comm'n v. FERC, 482 F.3d 510 (D.C. Cir. 2007), on exclusion of interruptible load from the computation of peak load responsibility under Entergy System Agreement, and on refunds to Entergy's Louisiana customers. Louisiana Public Service Comm'n, et al. v. Entergy Corp., 120 FERC ¶ 61,241 PDF (2007), reh'g denied, 124 FERC ¶ 61,275 PDF (2008).
      FERC Docket No. EL00-66, et al.
      Assigned to: Samuel Soopper
      Status: FERC motion for abeyance and voluntary remand granted 6/24/2009


    B   Top of Page

    Baltimore Gas and Electric Co., et al. v. FERC, No. 10-1189, et al. (D.C. Cir. filed 7/16/2010)

      Rate design to address the problem of rate pancaking across the Midwest ISO-PJM seam; development and implementation of Seams Elimination Cost Adjustment (SECA). Midwest Independent Transmission System Operator, Inc., and PJM Interconnection, LLC, et al., 131 FERC ¶ 61,174 PDF (2010) (order on rehearing), and numerous earlier orders.
      FERC Docket No. ER05-6, et al.
      Assigned to: Jennifer Amerkhail
      Status: returned to active status 11/15/2011


    Baltimore Gas and Electric Co., et al. v. FERC, No. 11-1425, et al. (D.C. Cir. filed 10/31/2011 and later)

      Rate design to address the problem of rate pancaking across the Midwest ISO-PJM seam; development and implementation of Seams Elimination Cost Adjustment (SECA).  Midwest Independent Transmission System Operator, Inc., and PJM Interconnection, LLC, et al., 131 FERC ¶ 61,173 PDF (2010), reh’g denied, 136 FERC ¶ 61,244 PDF (2011).
      FERC Docket No. ER05-6, et al.
      Assigned to: Beth Pacella
      Status: motions; consolidated with D.C. Cir. No. 03-1223, et al.


    Big Bog Energy, LP, et al. v. FERC, No. 11-1345 (D.C. Cir. filed 9/23/2011)

      Determinations not to allow Dispatchable Intermittent Resources to revert back to Intermittent Resource status, and involving real-time revenue sufficiency guarantee charges imposed by the Midwest ISO. Midwest Independent Transmission System Operator, Inc., 134 FERC ¶ 61,141 PDF (2011), reh’g denied, 136 FERC ¶ 61,100 PDF (2011).
      FERC Docket No. ER11-1991
      Assigned to: Judith Albert
      Status: consolidated with D.C. Cir. 06-1423, et al. 12/13/2011; in abeyance


    Black Oak Energy, L.L.C., et al. v. FERC, Nos. 08-1386, et al. (D.C. Cir. filed 12/12/2008)

      Complaint concerning allocation of transmission line losses to financial arbitrage transactions via a marginal methodology. Black Oak Energy, L.L.C., et al. v. PJM Interconnection, 122 FERC ¶ 61,208 PDF (2008), order on reh'g, 125 FERC ¶ 61,042 PDF (2008).
      FERC Docket No. EL08-14
      Assigned to: Samuel Soopper
      Status: in abeyance


    Braintree Electric Light Dept., et al. v. FERC, No. 09-1231 (D.C. Cir. filed 8/31/2009)

      Allocation of costs associated with ISO New England's operation of Canal 1 and 2 generating units out of economic merit. Braintree Electric Light. Dept., et al. v. ISO New England, Inc., 124 FERC ¶ 61,061 PDF (2008), order on reh'g, 128 FERC ¶ 61,008 PDF (2009).
      FERC Docket No. EL08-48
      Assigned to: Carol Banta
      Status: oral argument 9/12/2011


    Braintree Electric Light Dept., et al. v. FERC, No. 10-1395 (D.C. Cir. filed 11/19/2010)

      Order on ISO New England compliance filing, that Southeastern Massachusetts reliability region boundary continues to provide reasonable basis for allocation of Canal Unit dispatch costs. Braintree Electric Light Dept., et al. v. ISO New England, Inc., 129 FERC ¶ 61,077 PDF (2009), reh’g denied, 132 FERC ¶ 61,248 PDF (2010).
      FERC Docket No. EL08-48
      Assigned to: Carol Banta
      Status: consolidated with D.C. Cir. No. 09-1231; oral argument 9/12/2011


    Brian Hunter v. FERC, No. 11-1477 (D.C. Cir. filed 12/12/2011)

      Order affirming ALJ’s initial decision after hearing, and ordering payment of $30 million civil penalty, for Brian Hunter’s trading of natural gas futures contracts having a direct effect on the price of natural gas, in violation of FERC’s anti-market manipulation regulations under 18 C.F.R. § 1c.1, implementing section 4A of the Natural Gas Act, 15 U.S.C. § 717c-1. Brian Hunter, 135 FERC ¶ 61,054 PDF (2011), reh’g denied, 137 FERC ¶ 61,146 PDF (2011).
      FERC Docket No. IN07-26
      Assigned to: Lona Perry, Robert Kennedy
      Status: awaiting schedule


    Brandywine Conservancy, et al. v. FERC, Nos. 10-1028, et al. (D.C. Cir. filed 2/12/2010 and later)

      Authorizations to site, construct, and operate a liquefied natural gas terminal in Baltimore County, MD, and to construct and operate a 88-mile-long pipeline to transport LNG from LNG terminal to Eagle, PA. AES Sparrows Point LNG, LLC, and Mid-Atlantic Express, LLC, 126 FERC ¶ 61,019 PDF (2009), order on reh’g, clar. and stay, 129 FERC ¶ 61,245 PDF (2009), Errata Notice PDF.
      FERC Docket No. CP07-62 through -65
      Assigned to: Samuel Soopper
      Status: in abeyance


    Brian Hunter v. FERC, No. 11-1236 (D.C. Cir. filed 6/20/2011)

      Latest in series of appeals objecting to the FERC’s jurisdiction to investigate whether a natural person (Hunter) who traded natural gas futures contracts, having a direct effect on the price of natural gas, violated the FERC’s anti-market manipulation regulations under 18 C.F.R. § 1c.1, implementing section 4A of the Natural Gas Act, 15 U.S.C. § 717c-1.  Brian Hunter, 135 FERC ¶ 61,054 PDF (2011) (order affirming ALJ’s initial decision and ordering payment of civil penalty), reh’g pending.
      FERC Docket No. IN07-26
      Assigned to: Robert Kennedy/Lona Perry
      Status: motion to dismiss granted 10/14/2011


    C   Top of Page

    California Electricity Oversight Board, et al. v. FERC, Nos. 05-72328, et al. (9th Cir. filed 4/22/2005 and later)

      Approval of contested settlement between Avista and Trial Staff, resolving investigation of Avista’s trading activities. Avista Corp., et al., 107 FERC ¶ 61,055 PDF (2004), reh’g denied, 111 FERC ¶ 61,089 PDF (2005).
      FERC Docket No. EL02-115
      Assigned to: Robert Solomon
      Status: motions


    Calpine Corp., et al. v. FERC, No. 11-1122 (D.C. Cir. filed 4/29/2011)

      Order on remand from Southern California Edison Co. v. FERC, 603 F.3d 996 (D.C. Cir. 2010), on calculation of transmission service charges for station power, which need not use the same method as that used to calculate retail energy charges. Duke Energy Moss Landing v. California ISO Corp; California ISO Corp., 132 FERC ¶ 61,183 PDF (2010), reh'g denied, 134 FERC ¶ 61,151 PDF (2011).
      FERC Docket No. EL04-130, et al.
      Assigned to: Robert Kennedy
      Status: briefing


    Chevron Products Co. v. FERC and United States of America, Nos. 06-1017, et al. (D.C. Cir. filed 1/5/2006 and later)

      Order on ALJ's initial decision and on certain remanded issues, concerning rates for SFPP's East and West Lines. SFPP, L.P., et al., 113 FERC ¶ 61,277 PDF (2005).
      FERC Docket No. OR92-8, et al.
      Assigned to: Lona Perry
      Status: in abeyance


    City of Anaheim, Cal., et al. v. FERC, No. 11-1442 (D.C. Cir. filed 11/14/2011)

      Order characterizing South of Lugo Transmission Path as a zonal, rather than local, constraint, spreading costs to all utilities in the SP-15 zone, not just to Southern California Edison, but also to municipals.  California Indep. System Operator Corp.; Pacific Gas and Electric Co. v. California ISO, 121 FERC ¶ 61,193 PDF (2007), reh’g denied, 136 FERC ¶ 61,197 PDF(2011).
      FERC Docket No. ER04-835, et al.
      Assigned to: Karin Larson
      Status: briefing


    City of Palo Alto, et al. v. FERC, Nos. 04-1036, et al. (D.C. Cir. filed Jan 29, 2004 and later)

      Termination of Enron’s authority to trade electricity and natural gas at negotiated, market-based rates; denial of requests to participate as party-intervenors in an investigative/enforcement proceeding. Enron Power Marketing, Inc. and Enron Energy Services, Inc., et al., 102 FERC ¶ 61,316 PDF (2003) and 103 FERC ¶ 61,343 PDF (2003), reh’g denied, 106 FERC ¶ 61,024 PDF (2004); Fact-Finding Investigation of Potential Market Manipulation of Electric and Natural Gas Prices, et al., 105 FERC ¶ 61,063 PDF (2003), reh’g denied, 105 FERC ¶ 61,281 PDF (2003).
      FERC Docket Nos. EL03-77, et al.
      Assigned to: Robert Solomon
      Status: in abeyance pending resolution of 9th Cir. Nos. 03-72874, et al.


    Continental Airlines, Inc., et al. v. FERC and United States of America, No. 11-1479, et al. (D.C. Cir. filed 12/27/2011 and later)

      Opinion, after hearing and ALJ initial decision, addressing reasonableness of increased rates for shipment on SFPP’s West Line; various cost of service rate issues. SFPP, L.P., Opinion 511, 134 FERC ¶ 61,121 PDF (2011), order on reh’g and compl., Opinion 511-A, 137 FERC ¶ 61,220 PDF (2011).
      FERC Docket No. IS08-390
      Assigned to: Karin Larson
      Status: in abeyance


    Council of the City of New Orleans, et al. v. FERC, No. 11-1043, et al. (D.C. Cir. filed 2/14/2011)

      Withdrawal of Entergy Arkansas and Entergy Mississippi from Entergy System Agreement; consideration of exit notice, exit compensation, and cost allocation issues. Entergy Services, Inc., 129 FERC ¶ 61,143 PDF (2009), reh’g denied, 134 FERC ¶ 61,075 PDF (2011).
      FERC Docket No. ER09-636
      Assigned to: Carol Banta
      Status: oral argument 1/13/2012


    County of Butte, Cal. v. FERC, No. 10-70140 (9th Cir. filed 1/15/2010)

      Denial of complaint that California DWR, licensee for the Oroville Project in Butte County, California, was in violation of recreation and public safety requirements of its hydroelectric license. County of Butte, Cal. v. Cal. Dept. of Water Resources, 128 FERC ¶ 61,068 PDF (2009), reh'g denied, 129 FERC ¶ 61,133 PDF (2009).
      FERC Docket No. EL09-55, et al.
      Assigned to: Kathrine Henry
      Status: petition denied 8/2/2011


    County of Suffolk, New York, et al. v. FERC, Nos. 08-5087, et al. (2nd Cir. filed 10/17/2008 and later)

      Certification of Broadwater liquefied natural gas terminal in Long Island Sound and related pipeline facilities. Broadwater Energy LLC & Broadwater Pipeline LLC, 122 FERC ¶ 61,255 PDF (2008), reh'g denied, 124 FERC ¶ 61,225 PDF (2008).
      FERC Docket No. CP06-54 through CP06-56 et al.
      Assigned to: Beth Pacella
      Status: Unopposed motion to hold briefing schedule in abeyance for one year granted 10/8/2009, 9/22/2010, and 10/3/2011


    D   Top of Page

    DC Energy, LLC v. FERC, No. 10-1136 (D.C. Cir. filed 6/11/2010)

      Complaint and compliance filing concerning allocation of transmission line losses to financial arbitrage transactions via a marginal methodology. Black Oak Energy, L.L.C., et al. v. PJM Interconnection, 128 FERC ¶ 61,262 PDF (2009), reh’g denied, 131 FERC ¶ 61,024 PDF (2010).
      FERC Docket No. EL08-14
      Assigned to: Samuel Soopper
      Status: consolidated with D.C. Cir. No. 08-1366; in abeyance


    DC Energy Midwest, LLC v. FERC, No. 06-1423 (D.C. Cir. filed 12/22/2007)

      Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108 PDF (2006), order on reh'g, 117 FERC ¶ 61,113 PDF (2006).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: in abeyance


    DC Energy Midwest, LLC, et al. v. FERC, Nos. 09-1189, et al. (D.C. Cir. filed 7/1/2009 and later)

      Complaints regarding allocation of Revenue Sufficiency Guarantee charges to market participants under Midwest ISO tariff. Ameren Services Co., et al. v. Midwest Independent Transmission System Operator, 125 FERC ¶ 61,161 PDF (2008), order on reh'g, 127 FERC ¶ 61,121 PDF (2009).
      FERC Docket No. EL07-86, et al.
      Assigned to: Judith Albert
      Status: motions; related to D.C. Cir. No. 09-1006, et al.



    E   Top of Page

    E.O.N. U.S. LLC, et al. v. FERC, Nos. 07-1138, et al. (D.C. Cir. filed 5/14/2007)

      Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108 PDF (2006), order on reh'g, 117 FERC ¶ 61,113 PDF (2006). order on reh'g, 118 FERC ¶ 61,212 PDF (2007).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: related to D.C. Cir. No. 06-1423; in abeyance


    Edison Electric Institute v. FERC, No. 11-1111 (D.C. Cir. filed 4/18/2011)

      Approval and modification of transmission relay loadability standard submitted by NERC, to detect and protect the electric network from system fault conditions through development of load-responsive phase protection relays. Transmission Relay Loadability Reliability Standard, Order No. 733, 130 FERC ¶ 61,221 PDF (2010), order on reh’g & clar., 134 FERC ¶ 61,127 PDF (2011).
      FERC Docket No. RM08-13
      Assigned to: Lona Perry
      Status: voluntarily dismissed 10/20/2011


    Edison Mission Energy, Inc., et al. v. FERC, Nos. 09-1006, et al. (D.C. Cir. filed 1/8/2009)

      Complaints regarding allocation of Revenue Sufficiency Guarantee charges to market participants under Midwest ISO tariff. Ameren Services Co., et al. v. Midwest Independent Transmission System Operator, 121 FERC ¶ 61,205 PDF (2007), order on reh'g, 125 FERC ¶ 61,162 PDF (2008).
      FERC Docket No. EL07-86, et al.
      Assigned to: Judith Albert
      Status: related to D.C. Cir. Nos. 06-1423, et al., in abeyance


    Electric Power Supply Ass’n, et al. v. FERC, No. 11-1486, et al. (D.C. Cir. filed 12/23/2011 and later)
      Regulations requiring that demand response provider, participating in an organized wholesale energy market, be compensated at the market (locational marginal) price, when dispatch of demand response resource is cost-effective and can balance supply and demand. Demand Response Compensation in Organized Wholesale Energy Markets, Order No. 745, 76 Fed. Reg. 16,658 (2011), 134 FERC ¶ 61,187 PDF (2011), order on reh’g & clar., 137 FERC ¶ 61,215 PDF (2011).
      FERC Docket No. RM10-17
      Assigned to: Holly Cafer
      Status: motions


    El Paso Electric Co. v. FERC , No. 10-1194 (D.C. Cir. filed 7/23/2010)

      Order, after hearing and ALJ Initial Decision, on transmission rights under 1982 Exchange and Transmission Agreement between El Paso and Tucson. El Paso Electric Co. v. Tucson Electric Power Co., 125 FERC ¶ 61,171 PDF (2008), reh'g denied, 132 FERC ¶ 61,017 PDF (2010).
      FERC Docket No. EL06-45
      Assigned to: Robert Kennedy
      Status: voluntarily dismissed 10/4/2011


    El Paso Natural Gas Co. v. FERC, No. 10-1277 (D.C. Cir. filed 9/3/2010)

      Continued applicability of Article 11.2 of El Paso’s 1996 Settlement, placing certain limitations on the rates that El Paso can charge in future rate cases to shippers that were parties to the 1996 Settlement. El Paso Natural Gas Co., 114 FERC ¶ 61,290 PDF (2006) order on reh’g & compl, 124 FERC ¶ 61,227 PDF (2008), order on reh’g, 132 FERC ¶ 61,155 PDF (2010).
      FERC Docket No. RP05-422
      Assigned to: Beth Pacella
      Status: consolidated with D.C. Cir. No. 08-1349, et al.; oral argument 10/18/2011


    EPIC Merchant Energy, L.P., et al. v. FERC, No. 08-1395 (D.C. Cir. filed 12/23/2008)

      Order on compliance filing regarding allocation of real-time Revenue Sufficiency Guarantee costs. Midwest Independent Transmission System Operator, Inc., 121 FERC ¶ 61,132 PDF (2007), order on reh'g, 125 FERC ¶ 61,156 PDF (2008).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: in abeyance; consolidated with D.C. Cir. No. 06-1423


    EPIC Merchant Energy, L.P., et al. v. FERC, No. 10-1217 (D.C. Cir. filed 8/2/2010)

      Complaints regarding allocation of Revenue Sufficiency Guarantee charges to market participants under Midwest ISO tariff. Ameren Services Co., et al. v. Midwest Independent Transmission System Operator, 124 FERC ¶ 61,173 PDF (2008), reh'g denied, 131 FERC ¶ 61,214 PDF (2010).
      FERC Docket No. EL07-86, et al.
      Assigned to: Judith Albert
      Status: in abeyance, consolidated with D.C. Cir. No. 09-1066, et al.


    EPIC Merchant Energy NJ/PA, LP, et al. v. FERC, No. 11-1275 (D.C. Cir. filed 8/4/2011)

      Dismissal of complaint, similar to earlier complaint, concerning PJM’s method for determining marginal line losses and related charges. EPIC Merchant Energy NJ/PA, LP et al. v. PJM Interconnection, 131 FERC ¶ 61,130 PDF (2010), reh’g denied, 136 FERC ¶ 61,041 PDF (2011).
      FERC Docket No. EL10-40
      Assigned to: Samuel Soopper
      Status: consolidated with No. 08-1386; in abeyance


    ExxonMobil Gas & Power Marketing Co. and Hess Corp. v. FERC, No. 10-1098 (D.C. Cir. filed 5/14/2010)

      Commission acceptance and suspension of, and hearing on, limited rate filing to establish a mechanism to record and recover hurricane-related costs not recovered from insurance proceeds or third parties (Hurricane Surcharge). Sea Robin Pipeline Co., LLC, 128 FERC ¶ 61,286 PDF (2009), order on reh’g, 130 FERC ¶ 61,191PDF (2010).
      FERC Docket No. RP09-995
      Assigned to: Kathrine Henry
      Status: per curiam judgment dismissing petition, 10/21/2011

    F   Top of Page

    Freeport-McMoran Corp., et al. v. FERC, Nos. 08-1349, et al. (D.C. Cir. filed 11/3/2008 and later)

      Continued applicability of Article 11.2 of El Paso's 1996 Settlement, placing certain limitations on the rates that El Paso can charge in future rate cases to shippers that were parties to the 1996 Settlement. El Paso Natural Gas Co., 114 FERC ¶ 61,290 PDF (2006), order on reh'g & compl, 124 FERC ¶ 61,227 PDF (2008).
      FERC Docket No. RP05-422 et al.
      Assigned to: Beth Pacella, Lona Perry
      Status: oral argument 10/18/2011


    Freeport-McMoRan Corp. v. FERC, No. 10-1325 (D.C. Cir. filed 10/14/2010)

      Approval of contested 2006 Settlement, concerning rates associated with capacity allocation on El Paso system. El Paso Natural Gas Co., 120 FERC ¶ 61,208 PDF (2007), order on reh’g, 132 FERC ¶ 61,139 PDF (2010).
      FERC Docket No. RP05-422
      Assigned to: Beth Pacella, Lona Perry
      Status: consolidated with D.C. Cir. No. 08-1349, et al.; oral argument 10/18/2011


    G   Top of Page

    Gerald Richert v. FERC, No. 11-71990 (9th Cir. filed 7/18/2011)

      Relicensing of the City of Tacoma’s Cushman Hydroelectric Project No. 460; objection to settlement that imposes certain groundwater levels and removes obligation to build bridges providing access to certain properties. City of Tacoma, Washington, 132 FERC ¶ 61,037 PDF (2010), reh’g denied, 135 FERC ¶ 61,155 PDF (2011).
      FERC Docket No. P-460
      Assigned to: Judith Albert
      Status: briefing


    Grand Coulee Project Hydroelectric Authority v. FERC, No. 11-1239 (D.C. Cir. filed 6/20/2011)

      Dismissal of preliminary permit application to study the North Dam Pumped Storage Project, because applicant proposed to use the same water resource being studied under a preliminary permit issued to BPUS Generation for the Banks Lake Storage Project. Grand Coulee Project Hydroelectric Authority, 133 FERC ¶ 62,245 PDF (2010), reh’g denied, 135 FERC ¶ 61,046 PDF (2011).
      FERC Docket No. P-13681
      Assigned to: Holly Cafer
      Status: in abeyance


    Green Island Power Authority v. FERC, No. 11-1960 (2d Cir. filed 5/13/2011)

      Order reinstating the new license for the School Street Project to the applicant following remand in Green Island Power Authority v. FERC, 577 F.3d 148 (2d Cir. 2009), finding that the relicensing settlement agreement did not materially amend the license application in a manner requiring an opportunity for the public to intervene in the relicensing proceeding and that, in any event, a proffered alternative to replace the project is not a feasible alternative requiring consideration in the proceeding.  Erie Boulevard Hydropower, L.P., 131 FERC ¶ 61,036 PDF (2010), reh’g denied, 134 FERC ¶ 61,205 PDF (2011), reh’g pending.
      FERC Docket No. P-2539
      Assigned to: Holly Cafer
      Status: in abeyance


    Green Island Power Authority v. FERC, No. 11-3792 (2nd Cir. filed 9/19/2011)

      Order reinstating the new license for the School Street Project to the applicant following remand in Green Island Power Authority v. FERC, 577 F.3d 148 (2d Cir. 2009), finding that the relicensing settlement agreement did not materially amend the license application in a manner requiring an opportunity for the public to intervene in the relicensing proceeding and that, in any event, a proffered alternative to replace the project is not a feasible alternative requiring consideration in the proceeding. Erie Boulevard Hydropower, L.P., order on remand, 131 FERC ¶ 61,036 PDF (2010), reh’g denied, 134 FERC ¶ 61,205 PDF (2011), reh’g denied, 136 FERC ¶ 61,044 PDF (2011).
      FERC Docket No. P-2539
      Assigned to: Holly Cafer
      Status: briefing; related to 2nd Cir. No. 11-1960


    H   Top of Page

    I   Top of Page

    Illinois Commerce Comm’n, et al. v. FERC, Nos. 11-3421, et al. (7th Cir. filed 10/27/11 and later)

      Conditional acceptance of revisions to Midwest ISO tariff, finding that Multi Value Project (MVP) transmission planning and cost allocation methodology reasonably would identify projects that provide regional benefits and allocate the costs of those projects among regional beneficiaries. Midwest Independent Transmission System Operator, Inc., 133 FERC ¶ 61,221 PDF (2010), order on reh’g, 137 FERC ¶ 61,074 PDF (2011).
      FERC Docket No. ER10-1791
      Assigned to: Jennifer Amerkhail
      Status: motions


    Indiana Utility Regulatory Commission v. FERC, No. 10-1313 (D.C. Cir. filed 6/22/2010) (was 7th Cir. No. 10-2512)

      Conditional acceptance of PJM proposal to clarify the right of a retail regulatory authority to prohibit participation of a retail customer in PJM’s demand response programs. PJM Interconnection, LLC, 128 FERC ¶ 61,238 PDF (2009), order on reh'g & compl., 131 FERC ¶ 61,069 PDF (2010).
      FERC Docket No. ER09-701
      Assigned to: Samuel Soopper
      Status: oral argument 10/13/2011


    J   Top of Page

    James and Polly Lyons v. FERC, No. 11-1333 (4th Cir. filed 4/21/2011)

      Finding that licensee (Appalachian) complied with the terms of its license for the Smith Mountain Pumped Storage Project, concerning consistency of project uses (including boat docks) with Shoreline Management Plan. Appalachian Power Co., 133 FERC ¶ 61,135 PDF (2010), reh’g denied, 134 FERC ¶ 61,114 PDF (2011).
      FERC Docket No. P-2210
      Assigned to: Holly Cafer
      Status: briefing


    K   Top of Page

    Kern River Gas Transmission Co. v. FERC, No. 11-1332 (D.C. Cir. filed 9/19/2011)

      General rate case filing by Kern River; inclusion of Master Limited Partnerships in proxy group for determining rate of return, and various Period I and II rate design issues. Kern River Gas Transmission Co., Op. No. 486, 117 FERC ¶ 61,077 PDF (2006), order on reh'g, 123 FERC ¶ 61,056 PDF (2008), order on reh’g and compl., 129 FERC ¶ 61,240 PDF (2009), order on reh’g and compl., 133 FERC ¶ 61,162 PDF (2010), order on initial decision, 136 FERC ¶ 61,045 DOC (2011).
      FERC Docket No. RP04-274
      Assigned to: Lona Perry
      Status: dismissed 10/19/2011


    Kinder Morgan Interstate Gas Transmission LLC v. FERC, No. 11-1071 (D.C. Cir. filed 3/10/2011)

      Preliminary finding that Kinder Morgan may be substantially over-recovering its cost of service (in particular, its recovery of lost and unaccounted-for gas); initiation of investigation and hearing on whether Kinder Morgan’s rates remain just and reasonable. Kinder Morgan Interstate Gas Transmission LLC, 133 FERC ¶ 61,157 PDF (2010), order on reh’g, 134 FERC ¶ 61,061 PDF (2011).
      FERC Docket No. RP11-1494
      Assigned to: Robert Kennedy
      Status: voluntarily dismissed 10/26/2011


    L   Top of Page

    L.S. Starrett Co. v. FERC, No. 10-1470 (1st Cir. filed 4/15/2010)

      Finding that rehabilitation of Starrett’s Crescent Street Dam Project in Worcester County, Mass., increasing generating/turbine capacity of project, requires FERC license. L.S. Starrett Co., 129 FERC ¶ 62,053PDF (2009), reh’g denied, 130 FERC ¶ 61,112 PDF (2010).
      FERC Docket No. UL09-1
      Assigned to: Beth Pacella
      Status: petition denied 6/15/2011, petition for rehearing denied 8/31/2011


    M   Top of Page

    Maine Pub. Utils. Comm’n, et al. v. FERC, Nos. 06-1403, et al. (D.C. Cir. filed 12/12/2006)

      On remand from the U.S. Supreme Court in NRG Power Mktg. v. Maine Pub. Utils. Comm’n, 130 S. Ct. 693 (2010); whether auction results and transition payments arising from contested settlement represent contract rates that must be reviewed under Mobile-Sierra public interest standard; if not, whether the Commission has discretion under the circumstances to apply the public interest standard. Devon Power LLC, 115 FERC ¶ 61,340 PDF (2006), on reh’g, 117 FERC ¶ 61,133 PDF (2006), aff’d in most respects, Maine Pub. Utils. Comm’n v. FERC, 520 F.3d 464 PDF (D.C. Cir. 2008).
      FERC Docket No. ER03-563
      Assigned to: Robert Solomon
      Status: case remanded 11/5/2010


    Metro Hydroelectric Co., LLC v. FERC, No. 07-1514 (D.C. Cir. filed 12/17/2007)

      Termination of Integrated Licensing Process for the Metro Project in Summit County, Ohio, because Metro was unable to conduct certain pre-license application studies. Metro Hydroelectric Co., 121 FERC ¶ 61,049 PDF (2007), and earlier delegated letter orders.
      FERC Docket No. P-12484
      Assigned to: Carol Banta
      Status: in abeyance


    Mobil Pipe Line Co. v. FERC, No. 11-1021 (D.C. Cir. filed 1/28/2011)

      Order affirming ALJ’s Initial Decision, following hearing, and denying Mobil’s application for market-based rate authority. Mobil Pipe Line Co., 133 FERC ¶ 61,192 PDF (2010).
      FERC Docket No. OR07-21
      Assigned to: Judith Albert, Lona Perry
      Status: oral argument 11/17/2011


    Modesto Irrigation Dist., et al. v. FERC, No. 09-72775, et al. (9th Cir. filed 5/29/2009 and later)

      Order on remand from Bonneville Power Admin. v. FERC, 422 F.3d 908 (9th Cir. 2005), rescinding refund obligation of certain non-public utility entities participating in California ISO and PX markets prior to June 20, 2001, and clarifying pricing formulations in California ISO and PX tariffs. San Diego Gas & Electric Co. v. Sellers of Energy, et al., 121 FERC ¶ 61,067 PDF (2007), on clar., 121 FERC ¶ 61,188 PDF (2007), reh'g denied, 127 FERC ¶ 61,191 PDF (2009).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: motions


    Morgan Stanley Capital Group, Inc., et al. v. FERC, Nos. 06-71502, et al. (9th Cir. filed 3/23/2006)

      Order on cost filings concerning calculation of refunds in California Refund Proceeding. San Diego Gas & Electric Co., et al., 114 FERC ¶ 61,070 PDF (2006),(rehearing pending), and earlier orders.
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: motions


    Morgan Stanley Capital Group, Inc., et al. v. Public Utility District No. 1 of Snohomish County, Washington, et al., Nos. 06-1457, et al. (S.Ct. filed May 3, 2007)

      Application of Mobile-Sierra doctrine to long-term contracts for the wholesale sale of electricity at market-based rates. On petition for cert.; Public Utility Dist. No. 1 v. FERC, 471 F.3d 1053 (9th Cir. 2006), remanding Nevada Power Co., 103 FERC ¶ 61,353 PDF, order on reh’g, 105 FERC ¶ 61,185 PDF (2003)
      FERC Docket No. EL02-28, et al.
      Assigned to: Lona Perry
      Status: S.Ct. decision issued 6/28/2008


    Moussa I. Kourouma v. FERC, No. 11-1283 (D.C. Cir. filed 8/12/2011)

      Assessment of $50,000 civil penalty for submission of false information in connection with application for market-based rate authority. Moussa I. Kourouma d/b/a Quntum Energy LLC, 135 FERC ¶ 61,245 PDF (2011).
      FERC Docket No. IN11-2
      Assigned to: Robert Kennedy
      Status: briefing


    N   Top of Page

    New England Power Generators Ass’n, Inc. v. FERC, No. 11-1422 (D.C. Cir. filed 10/31/2011)

      Order on remand from Me. Pub. Utils. Comm’n v. FERC, 625 F.3d 754 (D.C. Cir. 2010), concerning two Mobile-Sierra issues reserved for decision: (1) whether auction results arising from a contested settlement approved by the Commission, establishing the Forward Capacity Market in New England, are tariff rates, not contract rates; and (2) if not contract rates, whether the Commission has discretion to approve a settlement provision imposing a more stringent (public interest) application of the statutory just and reasonable standard of review. Devon Power LLC, 134 FERC ¶ 61,208 PDF (2011), reh’g denied, 137 FERC ¶ 61,073 PDF (2011).
      FERC Docket No. ER03-563
      Assigned to: Lona Perry
      Status: motions


    New Jersey Board of Public Utilities, et al. v. FERC, Nos. 11-4245, et al. (3rd Cir. filed 11/25/2011 and later)

      Acceptance of PJM’s Minimum Offer Price Rule, imposing a minimum offer screen to determine whether an offer from a new resource is competitive, and designed to ensure that all new resources are offered on a competitive basis without exercise of market power.  PJM Interconnection, L.L.C., et al., 135 FERC ¶ 61,022 PDF (2011), order on compl. and reh’g,137 FERC ¶ 61,145 PDF (2011).
      FERC Docket No. ER11-2875, et al.
      Assigned to: Carol Banta
      Status: motions


    New York Independent System Operator, Inc. v. FERC, No. 11-1114 (D.C. Cir. filed 4/18/2011)

      Amended regulations, at 18 C.F.R. part 35, to improve the management of risk and use of credit in the organized wholesale electric markets.  Credit Reforms in Organized Wholesale Electric Markets, Order No. 741, FERC Stats. & Regs. ¶ 31,317 PDF (2010), order on reh’g, Order No. 741-A, FERC Stats. & Regs. ¶ 31,320 PDF (2011).
      FERC Docket No. RM10-13
      Assigned to: Samuel Soopper
      Status: in abeyance


    Northern California Power Agency, et al. v. FERC, Nos. 09-71514, et al. (9th Cir. filed 5/15/2009)

      Conditional approval of contested settlement agreement, distributing funds, from earlier settlements of Gaming and Partnership Proceedings, paid into FERC-controlled accounts to various entities. Duke Energy Trading and Marketing, L.L.C., et al.,, 125 FERC ¶ 61,345 PDF (2008) order on reh'g, 126 FERC ¶ 61,234 PDF (2009).
      FERC Docket No. EL03-152, et al.
      Assigned to: Robert Solomon
      Status: in abeyance; related to other 9th Cir. energy crisis approvals


    Northern Natural Gas Co. v. FERC, D.C. Cir. No. 11-1484 (D.C. Cir. filed 12/22/2011)
      Denial of application to abandon jointly-owned facilities – the Matagorda Offshore Pipeline System -- and services. Northern Natural Gas Co., 135 FERC ¶ 61,048 PDF (2011), reh’g denied, 137 FERC ¶ 61,091 PDF (2011).
      FERC Docket No. CP10-82
      Assigned to: Holly Cafer
      Status: awaiting schedule


    Northern Natural Gas Co. v. FERC, No. 11-1240 (D.C. Cir. filed 6/22/2011)

      Rejection of Northern Natural’s proposal to charge market-based rates for the resale of storage capacity. Northern Natural Gas Co., 133 FERC ¶ 61,210 PDF (2010), reh’g denied, 135 FERC ¶ 61,085 PDF (2011).
      FERC Docket No. RP10-841
      Assigned to: Beth Pacella
      Status: briefing


    NRG Power Marketing LLC, et al. v. FERC, No. 11-1201 (D.C. Cir. filed 6/1/2011)

      Approval of contested settlement and related transmission service agreements and Joint Operating Agreement Protocol; roll over of transmission service to Consolidated Edison. PJM Interconnection, LLC, et al., 132 FERC ¶ 61,221 PDF (2010), order on reh'g, 135 FERC ¶ 61,018 PDF (2011).
      FERC Docket No. ER08-858, et al.
      Assigned to: Samuel Soopper
      Status: briefing


    O   Top of Page

    Occidental Permian Ltd, et al. v. FERC, No. 10-1381 (D.C. Cir. filed 11/9/2010)

      Conditional authorization to Tres Amigas to sell, at negotiated rates, transmission services on proposed superstation connecting the three continental interconnections and allowing the transmission of intermittent wind and solar generation. Tres Amigas LLC, 130 FERC ¶ 61,207 PDF (2010), reh’g denied, 132 FERC ¶ 61,233 PDF (2010).
      FERC Docket No. ER10-396
      Assigned to: Jennifer Amerkhail
      Status: oral argument 2/14/2012


    Otter Tail Corp., et al. v. FERC, Nos. 08-1002, et al. (D.C. Cir. filed 1/4/2008)

      Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108 PDF (2006), order on reh'g, 117 FERC ¶ 61,113 PDF (2006), order on reh'g, 118 FERC ¶ 61,212 PDF (2007), order on reh'g, 121 FERC ¶ 61,131 PDF (2007).
      FERC Docket No. ER04-691
      Assigned to: Judith Albert
      Status: in abeyance; consolidated with D.C. Cir. No. 06-1423


    Otter Tail Power Co., et al. v. FERC, Nos. 09-1209, et al. (D.C. Cir. filed 7/24/2009 and later)



    Ozark Gas Transmission, L.L.C. v. FERC, No. 11-1091 (D.C. Cir. filed 3/28/2011)

      Preliminary finding that Ozark may be substantially over-recovering its cost of service (in particular, its recovery of lost and unaccounted-for gas); initiation of investigation and hearing on whether Ozark’s rates remain just and reasonable. Ozark Gas Transmission, L.L.C., 133 FERC ¶ 61,158 PDF (2010), order on reh’g, 134 FERC ¶ 61,062 PDF (2011), order on reh’g, 134 FERC ¶ 61,193 PDF (2011).
      FERC Docket No. RP11-1495
      Assigned to: Robert Kennedy
      Status: voluntarily dismissed 10/6/2011


    P   Top of Page

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 06-71888, et al. (9th Cir. filed 4/6/2006 and later)

      Order denying rehearing and granting clarification on treatment of emissions costs of LADWP during 10/2/00-6/20/01 refund period. San Diego Gas & Electric Co., et al., 112 FERC ¶ 61,323 PDF (2005), rorder on reh'g, 114 FERC ¶ 61,313 PDF (2006).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    Pacific Gas and Electric Co. v. FERC, No. 06-71320 (9th Cir. filed 3/14/2006)

      Order on submission of fuel cost allowance claims. San Diego Gas & Electric Co., et al., 114 FERC ¶ 61,223 PDF (2006), and earlier fuel cost allowance cases.
      Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: motions


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71831, et al. (9th Cir. filed 4/1/2005 and later)

      Order on rehearing of refund calculation issues. San Diego Gas & Electric Co., et al., 109 FERC ¶ 61,218 PDF (2004), order on reh’g, 110 FERC ¶ 61,336 PDF (2005).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71761, et al. (9th Cir. filed 3/29/2005 and later)

      Order on rehearing on submission of fuel cost allowance claims. San Diego Gas & Electric Co., et al., 109 FERC ¶ 61,297 PDF (2004), order on reh’g, 110 FERC ¶ 61,293 PDF (2005).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71436, et al. (9th Cir. filed 3/14/2005 and later)


      Termination of investigations into anomalous bidding behavior by suppliers into Western energy markets. Investigation of Anomalous Bidding Behavior and Practices in the Western Markets, 110 FERC ¶ 61,369 PDF (2005), dismissing rehearing of termination letters, dated May 12, 2004, sent by Director of OMOI to 30 suppliers.
      FERC Docket Nos. IN03-10, et al.
      Assigned to: Robert Solomon
      Status: in abeyance

    Pacific Gas and Electric Company, et al. v. FERC, Nos. 04-75609, et al. (9th Cir. filed 11/4/2004)


      Review of fuel cost allowance claims by independent auditors. San Diego Gas & Electric Co., et al., 108 FERC ¶ 61,219 PDF (2004), order on reh’g, 109 FERC ¶ 61,074 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: briefing stayed


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-74984, et al. (9th Cir. filed 9/29/2004 and later)

      Clarification of fuel cost allowance issues in calculation of MMCP refund methodology. San Diego Gas & Electric Co., et al., 107 FERC ¶ 61,166 PDF (2004), reh'g denied, 108 FERC ¶ 61,311 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: briefing stayed


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-72539, et al. (9th Cir. filed 5/21/2004 and later)

      Order clarifying methodology for calculating fuel cost allowances and requiring verification by an independent auditor. San Diego Gas & Electric Co., et al., 107 102 FERC ¶ 61,317 PDF (2003) order on clarification, 103 FERC ¶ 61,078 PDF (2003), order on reh’g, 107 FERC ¶ 61,166 TXT (May 12, 2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: briefing stayed


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-71019, et al. (9th Cir. filed March 4, 2004)


      Order granting interlocutory appeal and clarifying scope of discovery in partnership gaming show cause proceeding. Enron Power Marketing, Inc., et al., 105 FERC ¶ 61,362 PDF (2003), reh’g denied, 106 FERC ¶ 61,182 PDF (2004).
      FERC Docket Nos. EL03-180, et al.
      Attorney: Robert Solomon
      Status: briefing stayed


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-72381, et al. (9th Cir. filed 5/12/2004)

      Public release of most, but not all, documents relating to investigation of possible manipulation of energy prices in the West during 2000-2001. Fact-Finding Investigation of Potential Manipulation of Electric and Natural Gas Prices, 107 FERC ¶ 61,108 PDF (2004) [and earlier orders].
      FERC Docket Nos. PA02-2, et al.
      Assigned to: Robert Solomon
      Status: appeals stayed 8/26/2004


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71008, et al. (9th Cir.)

      Initiation of evidentiary show cause proceedings as to whether power trading companies engaged in gaming and/or anomalous market behavior, in violation of applicable tariffs, in western energy markets in 2000-2001. American Electric Power Service Corp., et al., 103 FERC ¶ 61,345 PDF (2003), and Enron Power Marketing, Inc., et al., 103 FERC ¶ 61,346 PDF (2003), reh’g denied, 106 FERC ¶ 61,020 PDF (2004).
      FERC Docket Nos. EL03-137, et al.
      Assigned to: Robert Solomon
      Status: appeals consolidated and briefing stayed 4/5/2005


    Pacific Gas and Electric Co., et al. v. FERC, Nos. 03-72874, et al. (9th Cir., filed Aug. 7, 2003 and later).

      Approval of Settlement Agreements with Reliant and Duke; denial of late intervention and party status to California Parties and other movants. Fact Finding Investigation into Possible Manipulation of Electric and Natural Gas Prices, 102 ¶ FERC 61,108 PDF (2003), interventions denied, 103 ¶ FERC 61,019 PDF (2003), reh'g dismissed, 104 ¶ FERC 61,146 PDF (2003); Reliant Energy Services, Inc., et al., 105 FERC ¶ 61,008 PDF (2003), reh'g dismissed, 105 FERC ¶ 61,253 PDF (2003).
      FERC Docket Nos. PA02-2, EL03-59, et al.
      Assigned to: Robert Solomon
      Status: briefing; oral argument 12/8/2004; Duke appeals withdrawn


    People of the State of California, et al. v. FERC, No. 11-71542 (9th Cir. filed 6/2/2011)

      Order on remand from Pub. Util. Comm’n of Cal. v. FERC, 462 F.3d 1027 (9th Cir. 2006), establishing an evidentiary, trial-type hearing before an ALJ on additional refund issues and clarifying scope of hearing. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 129 FERC ¶ 61,147 PDF (2009), order on reh’g, 135 FERC ¶ 61,183 PDF (2011).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    People of the State of California, et al. v. FERC, Nos. 10-71708, et al. (9th Cir. filed 5/26/2010 and later)

      Orders addressing requests for cost offsets from refunds by sellers seeking to demonstrate that the refund methodology applied to the relevant California markets from 10/2/00 through 6/20/10 resulted in an overall revenue shortfall for their transactions in those markets during that time. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 127 FERC ¶ 61,269PDF (2009), on reh’g, 131 FERC ¶ 61,144 PDF (2010).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    People of the State of California, et al. v. FERC, No. 10-71909 (9th Cir. filed 6/17/2010)

      Commission resolution of requests by parties seeking designation as non-public utilities for purposes of the California refund proceedings; determination that the Arizona Electric Power Cooperative should be designated a non-public utility. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 121 FERC ¶ 61,067 PDF (2007), on reh’g, 125 FERC ¶ 61,297 PDF (2008), on reh’g, 131 FERC ¶ 61,062 PDF (2010).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    People of the State of California, et al. v. FERC, No. 08-74306 (9th Cir. filed 10/14/2008)

      Order on remand from State of California ex rel. Lockyer v. FERC, 383 F.3d 1006 (9th Cir. 2004), setting for hearing violations of market-based rate quarterly reporting requirements during 2000-2001 and whether improper or untimely quarterly reporting masked an accumulation of market power, thus causing market-based rates to be unjust and unreasonable. State of California, ex rel. Bill Lockyer, Attorney General v. British Columbia Power Exchange Corp., et al., 122 FERC ¶ 61,260 PDF (2008), order on reh'g & clar., 125 FERC ¶ 61,016 PDF (2008).
      FERC Docket No. EL02-71
      Assigned to: Robert Solomon
      Status: in abeyance


    People of the State of California ex rel. Bill Lockyer, Attorney General, et al. v. FERC, Nos. 05-75487 (9th Cir. filed 9/16/2005 and later)

      Clarification of scope of proceeding as to Enron's market behavior in violation of tariffs. El Paso Electric Co., et al., 111 FERC ¶ 61,221 PDF (2005), reh'g denied, 112 FERC ¶ 61,256 PDF (2005).
      FERC Docket Nos. EL02-113, et al.
      Assigned to: Patrick Lee; Robert Solomon
      Status: in abeyance


    People of the State of California ex rel. Bill Lockyer, et al. v. FERC, Nos. 04-76229, et al. (9th Cir. filed 12/12/2004 and later)

      Order on rehearing of refund calculation issues. San Diego Gas & Electric Co., et al., 107 FERC ¶ 61,165 PDF (2004), order on reh’g, 109 FERC ¶ 61,218 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    People of the State of California, ex rel. Bill Lockyer, Attorney General, et al. v. FERC, Nos. 04-75295, et al. (9th Cir. filed 10/18/04 and later)

      Denial of California Parties’ request for consolidation of refund and investigative proceedings. San Diego Gas & Electric Co., et al., 103 FERC ¶ 61,359 PDF (2003), reh’g denied, 109 FERC ¶ 61,024 PDF (2004).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: transferred to D.C. Circuit 4/13/2005


    Port of Seattle, Washington, et al. v. FERC, Nos. 06-75708, et al. (9th Cir. filed 12/18/2006 and later)

      Approval of contested settlements between Enron, FERC Staff, Valley Electric Ass'n, and City of Santa Clara, California. Enron Power Marketing, Inc., et al., 115 FERC 61,376 PDF (2006), reh'g denied, 117 FERC 61,257 PDF (2006).
      FERC Docket Nos. EL03-180, et al.
      Assigned to: Robert Solomon
      Status: motions


    Port of Seattle v. FERC, No. 06-74383 (9th Cir. filed 8/31/2006)

      Approval of contested settlements between Enron, FERC Staff, Valley Electric Ass'n, and City of Santa Clara, California. Enron Power Marketing, Inc., et al., 115 FERC ¶ 61,376 PDF (2006).
      FERC Docket No. EL03-180, et al.
      Assigned to: Robert Solomon
      Status: motions


    Port of Seattle, Washington v. FERC, No. 06-72957 (9th Cir. filed 6/7/2006)

      Approval of global settlement of disputes between Reliant, California Parties and FERC Staff. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 113 FERC ¶ 61,308 PDF (2005), reh'g denied, 115 FERC ¶ 61,271 PDF (2006).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    Port of Seattle, Washington v. FERC, Nos. 06-75039, et al. (9th Cir. filed 10/25/2006 and later)

      Approval of contested settlement of disputes between energy suppliers and FERC Staff.  Mirant Energy Marketing, L.P., et al.,111 FERC 61,488 PDF (2005), reh'g denied,117 FERC ¶ 61,040 PDF (2006), and related settlement approval orders.
      FERC Docket No. EL03-158, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    Port of Seattle, Washington v. FERC, No. 06-72649 (9th Cir. filed 5/23/2006)

      Approval of contested settlement between Enron, California Parties and FERC Staff. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 113 FERC ¶ 61,171 PDF (2005), reh'g denied, 115 FERC ¶ 61,032 PDF (2006).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: in abeyance


    Potter Township Hydroelectric Auth. v. FERC, No. 00-1333 (D.C. Cir., filed Jul. 27, 2000).

      Petitioner challenges Commission orders denying its request for an extension of time to commence construction of the Emsworth Lock and Dam Hydroelectric Project, in order to avoid termination of is license. Potter Township Hydroelectric Auth., 90 FERC ¶ 61,312 [TIF] (2000), reh'g denied by operation of law, 91 FERC ¶ 61,190 [TIF] (2000).
      FERC Docket No. P-7041
      Assigned to: Lona Perry
      Status: in abeyance


    PPL EnergyPlus, LLC v. FERC, No. 11-1341 (D.C. Cir. filed 9/23/2011)

      Dismissal of PPL complaint regarding PJM’s modeling of outages of two months or more in its simultaneous feasibility tests for financial transmission rights and auction revenue rights; failure to model the Meadowbrook-Morrisville 500 kV construction-related transmission outage in PJM feasibility tests conducted for 2010/2011 auctions. PPL EnergyPlus, LLC v. PJM Interconnection, 134 FERC ¶ 61,263 PDF (2011), reh’g denied, 136 FERC ¶ 61,060 PDF (2011).
      FERC Docket No. EL11-25
      Assigned to: Carol Banta
      Status: awaiting schedule


    PSEG Energy Resources & Trade, et al. v. FERC, No. 10-1103 (D.C. Cir. filed 5/20/2010)

      Order accepting ISO New England’s first Forward Capacity Auction, for the 2010-2011 Capacity Commitment Period. ISO New England, Inc., 123 FERC ¶ 61,290
      PDF (2008), reh’g denied, 130 FERC ¶ 61,235 PDF (2010).
      FERC Docket No. ER08-633
      Assigned to: Jennifer Amerkhail
      Status: oral argument 9/22/2011


    Public Citizen Inc., et al. (was Montana Consumer Counsel) v. FERC, No. 08-71827 (9th Cir. filed 5/1/2008)

      Rulemaking codifying and, in certain respects, modifying FERC standards for obtaining and retaining market-based rates for public utilities, at 18 CFR, Part 35, Subpart H. Market-Based Rates for Wholesale Sales of Electric Energy by Public Utilities, Order 697, 119 FERC ¶ 61,295 PDF (2007), order on reh'g and clar., 123 FERC ¶ 61,055 PDF (2008).
      FERC Docket No. RM04-7
      Assigned to: Carol Banta, Robert Solomon
      Status: petition denied 10/13/2011


    Public Service Commission of the State of New York, et al. v. FERC, Nos. 08-1366, et al. (D.C. Cir. filed 11/21/2008 and later)

      Conditional approval of NY ISO proposals to strengthen market mitigation in New York City (in-city) installed capacity market. New York Independent System Operator, Inc., 122 FERC ¶ 61,211 PDF (2008), order on reh'g & compl., 124 FERC ¶ 61,301 PDF (2008).
      FERC Docket No. EL07-39, et al.
      Assigned to: Jennifer Amerkhail
      Status: in abeyance


    Public Service Elec. and Gas Co., et al. v. FERC, Nos. 07-1210, et al. (D.C. Cir. filed 6/18/2007 and later)

      Complaint proceeding concerning two 1970s-era contracts providing for PSE&G to receive up to 1000 MW of power from ConEd in upstate New York and to redeliver same amount of power to ConEd in New York City; protocols governing each party's responsibilities in performing contractual wheeling. Consolidated Edison Co. of New York v. Public Service Electric and Gas Co., Op. 476, 108 FERC ¶ 61,120 PDF (2004), order on reh'g and inform. reports, 119 FERC ¶ 61,070 PDF and 61,071 PDF (2007), reh'g denied, 120 FERC ¶ 61,161 PDF (2007).
      FERC Docket No. EL02-23
      Assigned to: Lona Perry
      Status: in abeyance


    Public Utilities Comm'n of California v. FERC, No. 08-1261 (D.C. Cir. filed 8/8/2008)

      Declaratory order approving incentive rate treatments for certain transmission projects, consistent with Order 679. Southern California Edison Co., 121 FERC ¶ 61,168 121 FERC ¶ 61,168 PDF (2007), reh'g denied, 123 FERC ¶ 61,293 PDF (2008).
      FERC Docket No. EL07-62
      Assigned to: Samuel Soopper
      Status: in abeyance


    Public Utilities Commission of California, et al. v. FERC, Nos. 03-74207, et al. (9th Cir. filed November 17, 2003 and later)

      Denial of complaints seeking modification of long-term contracts, executed in early 2001 at height of California energy crisis between the California Department of Water Resources and five wholesale energy suppliers. Public Utilities Commission of the State of California v. Sellers of Long Term Contracts to the California Department of Water Resources, et al., 103 FERC ¶ 61,354 PDF (2003), order on reh'g, 105 FERC ¶ 61,182, PDF (2003) [and earlier orders].
      FERC Docket Nos. EL02-60, et al.
      Assigned to: Lona Perry
      Status: briefing; oral argument 12/8/2004


    Public Utilities Commission of the State of California, et al. v. FERC, Nos. 01-71051, et al. (9th Cir., filed June 29, 2001 and later)

      Numerous petitioners challenge various aspects of the Commission's market mitigation and monitoring plan for the California and Western wholesale electricity markets. San Diego Gas & Elec. Co., et al., 93 FERC ¶ 61,294 [TIF] (2000); 95 FERC ¶ 61,115 PDF (2001); 95 FERC ¶ 61,418 [TIF] (2001); 96 FERC ¶ 61,120 [TIF] (2001); 97 FERC ¶ 61,275 PDF (2001); 99 FERC ¶ 61,160 PDF (2002).
      FERC Docket Nos. EL00-95, et al.
      Assigned to: Dennis Lane, Robert Solomon, Beth Pacella
      Status: Case management conferences 9/21/2004 and 11/9/2004; briefing on Phase One “scope” issues; oral argument 4/12-13/2005


    Public Utility District of Snohomish County, Wash. v. FERC, No. 11-71366 (9th Cir. filed 5/12/2011)

      Direction to Electric Reliability Organization to revise the definition of the term “bulk electric system” through the ERO’s Reliability Standards Development Process to address the Commission’s policy and technical concerns and ensure that the definition encompasses all facilities necessary for operating an interconnected electric transmission network. Revision to Electric Reliability Organization Definition of Bulk Electric System, Order No. 743, 133 FERC ¶ 61,150 PDF (2010), order on reh’g, 134 FERC ¶ 61,210 PDF (2011).
      FERC Docket No. RM09-18
      Assigned to: Lona Perry
      Status: in abeyance; unopposed motion to transfer to D.C. Circuit granted 8/16/2011

    Q   Top of Page

    R   Top of Page

    S   Top of Page

    Sacramento Municipal Utility District v. FERC, Nos. 09-1279 and 09-1280 (D.C. Cir. filed 11/12/2009)

      Approval of settlements of disputes among California Parties, Puget Sound Energy, and AES Placerita. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 128 FERC ¶ 61,002 PDF (2009), reh'g denied, 128 FERC ¶ 61,241 PDF (2009); 128 FERC ¶ 61,004 PDF (2009), reh'g denied, 128 FERC ¶ 61,243 PDF (2009).
      FERC Docket No. EL00-95, et al.
      Assigned to: Robert Solomon
      Status: motions


    Sacramento Utility Municipal District v. FERC, Nos. 10-71251, et al. (9th Cir. filed 4/19/2010 and later)



    Southern California Edison Co. v. FERC, No. 11-1471 (D.C. Cir. filed 12/5/2011)

      Order approving a base return on equity of 9.54 percent for three of Southern California Edison’s transmission projects.  Southern California Edison Co., 131 FERC ¶ 61,020 PDF (2010), order on reh’g and clar., 137 FERC ¶ 61,016 PDF (2011).
      FERC Docket No. ER08-375, et al.
      Assigned to: Samuel Soopper
      Status: briefing


    St. Regis Mohawk Tribe, et al. v. FERC, No. 04-4231 (2nd Cir. filed 8/13/2004)

      New license for NYPA's continued operation of the St. Lawrence-FDR Project; allocation of project power to neighboring states. New York Power Authority, et al., 105 FERC ¶ 61,102 PDF (2003), order on reh'g, 107 FERC ¶ 61,259 PDF (2004).
      FERC Docket Nos. P-2000 and EL03-224
      Assigned to: Robert Solomon
      Status: in abeyance


    T   Top of Page

    TC Ravenswood, LLC v. FERC, No. 12-1008 (D.C. Cir. filed 1/6/2012)


    TC Ravenswood, LLC v. FERC, No. 11-1258 (D.C. Cir. filed 7/12/2011)

      Conditional acceptance of proposal by New York ISO to implement market mitigation measures for generators located in the rest-of-state (outside New York City and Long Island) capacity region in New York. New York Indep. System Operator, Inc., 133 FERC ¶ 61,030 PDF (2010), order on reh’g, 135 FERC ¶ 61,157 PDF (2011).
      FERC Docket No. ER10-2220
      Assigned to: Jennifer Amerkhail
      Status: briefing


    TC Ravenswood, LLC v. FERC, No. 11-1305 (D.C. Cir. filed 8/25/2011)

      Acceptance in part and rejection in part of proposal by New York ISO to strengthen market power mitigation in New York City (in-city) installed capacity market. New York Independent System Operator, Inc., 133 FERC ¶ 61,178 PDF (2010), order on compl., 134 FERC ¶ 61,083 PDF (2011), order on reh’g and clar., 136 FERC ¶ 61,077 PDF (2011).
      FERC Docket No. ER10-3043
      Assigned to: Jennifer Amerkhail
      Status: motions


    Terra-Gen Dixie Valley, LLC v. FERC, No. 11-1259 (D.C. Cir. filed 7/12/2011)

      Transmission rights to existing and future planned capacity on Dixie Valley's existing 212-mile, 230 kV radial generator tie line; filing of open access transmission tariff to govern the rates, terms and conditions of future transmission service on the Dixie Valley line. Terra-Gen Dixie Valley, LLC, 134 FERC ¶ 61,027 PDF (2011), order on reh’g and tariff filing, 135 FERC ¶ 61,134 PDF (2011).
      FERC Docket No. EL11-37, et al.
      Assigned to: Jennifer Amerkhail
      Status: in abeyance


    Texas Pipeline Ass’n, et al. v. FERC , Nos. 10-60066, et al. (5th Cir. filed 1/27/2010 and later)

      Modification of regulations concerning obligation of pipelines to post daily scheduled volume information and other data for certain points, to facilitate price transparency in FERC-regulated markets. Pipeline Posting Requirements Under Section 23 of the Natural Gas Act, Order No. 720, 73 Fed. Reg. 73,494, 125 FERC ¶ 61,211 PDF (2008), order on reh’g & clar., Order No. 720-A, 130 FERC ¶ 61,040 PDF (2010).
      FERC Docket No. RM08-2
      Assigned to: Beth Pacella, Samuel Soopper, Robert Solomon
      Status: petition granted 10/24/2011; court order granting FERC motion to clarify, issued 12/20/2011


    The Empire District Electric Co., et al. v. FERC, No. 11-3715 (8th Cir. filed 12/13/2011)

      Order accepting Southwest Power Pool’s Highway/Byway method of cost allocation.  Southwest Power Pool, Inc., 131 FERC ¶ 61,252 PDF (2010), order on reh’g, 137 FERC ¶ 61,075 PDF (2011).
      FERC Docket No. ER10-1069
      Assigned to: Jennifer Amerkhail
      Status: in abeyance


    Transmission Agency of Northern California, et al. v. FERC, Nos. 09-1213, et al. (D.C. Cir. filed 8/5/2009 and later)

      Conditional acceptance of proposed tariff revisions submitted by the California ISO to establish an Integrated Balancing Authority Area, modeling and pricing export and import transactions with the SMUD and Turlock balancing authority areas. California Independent System Operator Corp., 124 FERC ¶ 61,271 PDF (2008), order on reh'g & clar., 128 FERC ¶ 61,103 PDF (2009).
      FERC Docket No. ER08-1113
      Assigned to: Samuel Soopper
      Status: petition for certiorari denied 6/13/2011


    Turlock Irrigation District v. FERC, No. 10-1008 (D.C. Cir. filed 1/12/2010)

      Conditional acceptance, subject to modification, of California ISO compliance tariff filing; pricing under Market Efficiency Enhancement Agreement for resources within the Integrated Balancing Authority Area. California Indep. System Operator Corp., 126 FERC ¶ 61,207 PDF (2009), order on reh'g, 129 FERC ¶ 61,241 PDF (2009).
      FERC Docket No. ER08-1113
      Assigned to: Samuel Soopper
      Status: voluntarily dismissed 7/8/2011


    U   Top of Page

    United Water Conservation District v. FERC and National Marine Fisheries Service, No. 10-1027 (D.C. Cir. filed 2/12/2010)

      Relicensing of Santa Felicia Project, on Piru Creek in Ventura County, Cal.; objections to biological opinion, concerning endangered steelhead trout, prepared by the National Marine Fisheries Service under the Endangered Species Act. United Water Conservation District, 124 FERC ¶ 62,193 PDF (2008), reh'g denied, 129 FERC ¶ 61,244 PDF (2009).
      FERC Docket No. P-2153
      Assigned to: Beth Pacella
      Status: in abeyance


    Upper Yampa Water Conservancy District v. FERC, No. 11-9583 (10th Cir. filed 12/19/2011)
      Denial of application to sell, lease or otherwise remove project lands within the licensed boundary of the Stagecoach Project on the Yampa River in Routt County, Colorado. Upper Yampa Water Conservation District, 136 FERC ¶ 62,217 PDF (2011), reh’g denied, 137 FERC ¶ 61,053 PDF (2011).
      FERC Docket No. P-9202
      Assigned to: Judith Albert
      Status: briefing


    V   Top of Page

    Valero Marketing and Supply Co. v. FERC, No. 11-1266 (D.C. Cir. filed 7/22/2011)

      Five-year review of oil pricing index, following consideration of comments, setting index ceiling level at Producer Price Index for Finished Goods plus 2.65 percent. Five-Year Review of Oil Pipeline Index, 133 FERC ¶ 61,228 PDF (2010), reh’g denied, 135 FERC ¶ 61,172 DOC (2011).
      FERC Docket No. RM10-25
      Assigned to: Lona Perry
      Status: briefing


    W   Top of Page

    Williams Alaska Petroleum Inc. v. FERC and United States of America, No. 07-1421 (D.C. Cir. filed 10/18/2007)

      Motion for ruling on retroactive calculations concerning TAPS Quality Bank. Trans Alaska Pipeline System, 119 FERC ¶ 61,254 PDF (2007), reh'g denied, 120 FERC ¶ 61,279 PDF (2007)
      FERC Docket No. OR89-2
      Assigned to: Beth Pacella
      Status: in abeyance