Alabama Municipal Electric Authority v. FERC, No. 10-1141 (D.C. Cir. filed 6/28/2010)
-
Denial of complaint that rates under the Southern Company open access transmission tariff fail to meet the Commission’s comparability standard. Alabama Municipal Electric Authority v. Alabama Power Co. and Southern Co. Services, Inc., 119 FERC ¶ 61,286
Assigned to: Lona Perry, Beth Pacella
Status: petition denied 12/13/2011
American Electric Power Service Corp., et al. v. FERC, Nos. 03-1223, et al. (D.C. Cir., filed Aug. 1, 2003).
-
Conditional acceptance of proposals by the various Alliance
Companies to join either the Midwest ISO or PJM. Alliance
Cos., et al., 100
FERC ¶ 61,137
FERC Docket No. ER03-765
Assigned to: Beth Pacella
Status: in abeyance
American Electric Power Service Corp., et al. v. FERC, Nos. 04-1017, et al. (D.C. Cir., filed Jan. 14, 2004 and later)
-
Rates for regional “through and out” service between
Midwest ISO and PJM. Midwest Independent Transmission System
Operator, et al., 104
FERC ¶ 61,105
FERC Docket Nos. EL02-111, et al.
Assigned to: Beth Pacella
Status: abeyance
Arkansas Public Service Comm'n, et al. v. FERC, Nos. 08-1330, et al. (D.C. Cir. filed 10/14/2008 and later)
-
Order on remand from Louisiana Public Service Comm'n v. FERC, 482 F.3d 510 (D.C. Cir. 2007), on exclusion of interruptible load from the computation of peak load responsibility under Entergy System Agreement, and on refunds to Entergy's Louisiana customers. Louisiana Public Service Comm'n, et al. v. Entergy Corp.,
120 FERC ¶ 61,241
FERC Docket No. EL00-66, et al.
Assigned to: Samuel Soopper
Status: FERC motion for abeyance and voluntary remand granted 6/24/2009
B Top of Page
Baltimore Gas and Electric Co., et al. v. FERC, No. 10-1189, et al. (D.C. Cir. filed 7/16/2010)
- Rate design to address the problem of rate pancaking across the Midwest ISO-PJM seam; development and implementation of Seams Elimination Cost Adjustment (SECA). Midwest Independent Transmission System Operator, Inc., and PJM Interconnection, LLC, et al., 131 FERC ¶ 61,174
FERC Docket No. ER05-6, et al.
Assigned to: Jennifer Amerkhail
Status: returned to active status 11/15/2011
Baltimore Gas and Electric Co., et al. v. FERC, No. 11-1425, et al. (D.C. Cir. filed 10/31/2011 and later)
- Rate design to address the problem of rate pancaking across the Midwest ISO-PJM seam; development and implementation of Seams Elimination Cost Adjustment (SECA). Midwest Independent Transmission System Operator, Inc., and PJM Interconnection, LLC, et al., 131 FERC ¶ 61,173
FERC Docket No. ER05-6, et al.
Assigned to: Beth Pacella
Status: motions; consolidated with D.C. Cir. No. 03-1223, et al.
Big Bog Energy, LP, et al. v. FERC, No. 11-1345 (D.C. Cir. filed 9/23/2011)
- Determinations not to allow Dispatchable Intermittent Resources to revert back to Intermittent Resource status, and involving real-time revenue sufficiency guarantee charges imposed by the Midwest ISO. Midwest Independent Transmission System Operator, Inc., 134 FERC ¶ 61,141
FERC Docket No. ER11-1991
Assigned to: Judith Albert
Status: consolidated with D.C. Cir. 06-1423, et al. 12/13/2011; in abeyance
Black Oak Energy, L.L.C., et al. v. FERC, Nos. 08-1386, et al. (D.C. Cir. filed 12/12/2008)
-
Complaint concerning allocation of transmission line losses to financial arbitrage transactions via a marginal methodology. Black Oak Energy, L.L.C., et al. v. PJM Interconnection, 122 FERC ¶ 61,208
FERC Docket No. EL08-14
Assigned to: Samuel Soopper
Status: in abeyance
Braintree Electric Light Dept., et al. v. FERC, No. 09-1231 (D.C. Cir. filed 8/31/2009)
- Allocation of costs associated with ISO New England's operation of Canal 1 and 2 generating units out of economic merit. Braintree Electric Light. Dept., et al. v. ISO New England, Inc., 124 FERC ¶ 61,061
FERC Docket No. EL08-48
Assigned to: Carol Banta
Status: oral argument 9/12/2011
Braintree Electric Light Dept., et al. v. FERC, No. 10-1395 (D.C. Cir. filed 11/19/2010)
-
Order on ISO New England compliance filing, that Southeastern Massachusetts reliability region boundary continues to provide reasonable basis for allocation of Canal Unit dispatch costs. Braintree Electric Light Dept., et al. v. ISO New England, Inc., 129 FERC ¶ 61,077
FERC Docket No. EL08-48
Assigned to: Carol Banta
Status: consolidated with D.C. Cir. No. 09-1231; oral argument 9/12/2011
Brian Hunter v. FERC, No. 11-1477 (D.C. Cir. filed 12/12/2011)
- Order affirming ALJ’s initial decision after hearing, and ordering payment of $30 million civil penalty, for Brian Hunter’s trading of natural gas futures contracts having a direct effect on the price of natural gas, in violation of FERC’s anti-market manipulation regulations under 18 C.F.R. § 1c.1, implementing section 4A of the Natural Gas Act, 15 U.S.C. § 717c-1. Brian Hunter, 135 FERC ¶ 61,054
FERC Docket No. IN07-26
Assigned to: Lona Perry, Robert Kennedy
Status: awaiting schedule
Brandywine Conservancy, et al. v. FERC, Nos. 10-1028, et al. (D.C. Cir. filed 2/12/2010 and later)
-
Authorizations to site, construct, and operate a liquefied natural gas terminal in Baltimore County, MD, and to construct and operate a 88-mile-long pipeline to transport LNG from LNG terminal to Eagle, PA. AES Sparrows Point LNG, LLC, and Mid-Atlantic Express, LLC, 126 FERC ¶ 61,019
FERC Docket No. CP07-62 through -65
Assigned to: Samuel Soopper
Status: in abeyance
Brian Hunter v. FERC, No. 11-1236 (D.C. Cir. filed 6/20/2011)
- Latest in series of appeals objecting to the FERC’s jurisdiction to investigate whether a natural person (Hunter) who traded natural gas futures contracts, having a direct effect on the price of natural gas, violated the FERC’s anti-market manipulation regulations under 18 C.F.R. § 1c.1, implementing section 4A of the Natural Gas Act, 15 U.S.C. § 717c-1. Brian Hunter, 135 FERC ¶ 61,054
FERC Docket No. IN07-26
Assigned to: Robert Kennedy/Lona Perry
Status: motion to dismiss granted 10/14/2011
C Top of Page
California Electricity Oversight Board, et al. v. FERC, Nos. 05-72328, et al. (9th Cir. filed 4/22/2005 and later)
-
Approval of contested settlement between Avista and Trial Staff, resolving investigation of Avista’s trading activities. Avista Corp., et al., 107 FERC ¶ 61,055
FERC Docket No. EL02-115
Assigned to: Robert Solomon
Status: motions
Calpine Corp., et al. v. FERC, No. 11-1122 (D.C. Cir. filed 4/29/2011)
-
Order on remand from Southern California Edison Co. v. FERC, 603 F.3d 996 (D.C. Cir. 2010), on calculation of transmission service charges for station power, which need not use the same method as that used to calculate retail energy charges. Duke Energy Moss Landing v. California ISO Corp; California ISO Corp., 132 FERC ¶ 61,183
FERC Docket No. EL04-130, et al.
Assigned to: Robert Kennedy
Status: briefing
Chevron Products Co. v. FERC and United States of America, Nos. 06-1017, et al. (D.C. Cir. filed 1/5/2006 and later)
-
Order on ALJ's initial decision and on certain remanded issues, concerning rates for SFPP's East and West Lines. SFPP, L.P., et al., 113 FERC ¶ 61,277
FERC Docket No. OR92-8, et al.
Assigned to: Lona Perry
Status: in abeyance
City of Anaheim, Cal., et al. v. FERC, No. 11-1442 (D.C. Cir. filed 11/14/2011)
- Order characterizing South of Lugo Transmission Path as a zonal, rather than local, constraint, spreading costs to all utilities in the SP-15 zone, not just to Southern California Edison, but also to municipals. California Indep. System Operator Corp.; Pacific Gas and Electric Co. v. California ISO, 121 FERC ¶ 61,193
FERC Docket No. ER04-835, et al.
Assigned to: Karin Larson
Status: briefing
City of Palo Alto, et al. v. FERC, Nos. 04-1036, et al. (D.C. Cir. filed Jan 29, 2004 and later)
-
Termination of Enron’s authority to trade electricity
and natural gas at negotiated, market-based rates; denial of
requests to participate as party-intervenors in an investigative/enforcement
proceeding. Enron Power Marketing, Inc. and Enron Energy
Services, Inc., et al., 102
FERC ¶ 61,316
FERC Docket Nos. EL03-77, et al.
Assigned to: Robert Solomon
Status: in abeyance pending resolution of 9th Cir. Nos. 03-72874, et al.
Continental Airlines, Inc., et al. v. FERC and United States of America, No. 11-1479, et al. (D.C. Cir. filed 12/27/2011 and later)
-
Opinion, after hearing and ALJ initial decision, addressing reasonableness of increased rates for shipment on SFPP’s West Line; various cost of service rate issues. SFPP, L.P., Opinion 511, 134 FERC ¶ 61,121
FERC Docket No. IS08-390
Assigned to: Karin Larson
Status: in abeyance
Council of the City of New Orleans, et al. v. FERC, No. 11-1043, et al. (D.C. Cir. filed 2/14/2011)
-
Withdrawal of Entergy Arkansas and Entergy Mississippi from Entergy System Agreement; consideration of exit notice, exit compensation, and cost allocation issues. Entergy Services, Inc., 129 FERC ¶ 61,143
FERC Docket No. ER09-636
Assigned to: Carol Banta
Status: oral argument 1/13/2012
County of Butte, Cal. v. FERC, No. 10-70140 (9th Cir. filed 1/15/2010)
-
Denial of complaint that California DWR, licensee for the Oroville Project in Butte County, California, was in violation of recreation and public safety requirements of its hydroelectric license. County of Butte, Cal. v. Cal. Dept. of Water Resources, 128 FERC ¶ 61,068
FERC Docket No. EL09-55, et al.
Assigned to: Kathrine Henry
Status: petition denied 8/2/2011
County of Suffolk, New York, et al. v. FERC, Nos. 08-5087, et al. (2nd Cir. filed 10/17/2008 and later)
-
Certification of Broadwater liquefied natural gas terminal in Long Island Sound and related pipeline facilities. Broadwater Energy LLC & Broadwater Pipeline LLC, 122 FERC ¶ 61,255
FERC Docket No. CP06-54 through CP06-56 et al.
Assigned to: Beth Pacella
Status: Unopposed motion to hold briefing schedule in abeyance for one year granted 10/8/2009, 9/22/2010, and 10/3/2011
D Top of Page
DC Energy, LLC v. FERC, No. 10-1136 (D.C. Cir. filed 6/11/2010)
-
Complaint and compliance filing concerning allocation of transmission line losses to financial arbitrage transactions via a marginal methodology. Black Oak Energy, L.L.C., et al. v. PJM Interconnection, 128 FERC ¶ 61,262
FERC Docket No. EL08-14
Assigned to: Samuel Soopper
Status: consolidated with D.C. Cir. No. 08-1366; in abeyance
DC Energy Midwest, LLC v. FERC, No. 06-1423 (D.C. Cir. filed 12/22/2007)
-
Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc.,
115 FERC ¶ 61,108
FERC Docket No. ER04-691
Assigned to: Judith Albert
Status: in abeyance
DC Energy Midwest, LLC, et al. v. FERC, Nos. 09-1189, et al. (D.C. Cir. filed 7/1/2009 and later)
-
Complaints regarding allocation of Revenue Sufficiency Guarantee charges to market participants under Midwest ISO tariff. Ameren Services Co., et al. v. Midwest Independent Transmission System Operator, 125 FERC ¶ 61,161
FERC Docket No. EL07-86, et al.
Assigned to: Judith Albert
Status: motions; related to D.C. Cir. No. 09-1006, et al.
E Top of Page
E.O.N. U.S. LLC, et al. v. FERC, Nos. 07-1138, et al. (D.C. Cir. filed 5/14/2007)
-
Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108
FERC Docket No. ER04-691
Assigned to: Judith Albert
Status: related to D.C. Cir. No. 06-1423; in abeyance
Edison Electric Institute v. FERC, No. 11-1111 (D.C. Cir. filed 4/18/2011)
-
Approval and modification of transmission relay loadability standard submitted by NERC, to detect and protect the electric network from system fault conditions through development of load-responsive phase protection relays. Transmission Relay Loadability Reliability Standard, Order No. 733, 130 FERC ¶ 61,221
FERC Docket No. RM08-13
Assigned to: Lona Perry
Status: voluntarily dismissed 10/20/2011
Edison Mission Energy, Inc., et al. v. FERC, Nos. 09-1006, et al. (D.C. Cir. filed 1/8/2009)
-
Complaints regarding allocation of Revenue Sufficiency Guarantee charges to market participants under Midwest ISO tariff. Ameren Services Co., et al. v. Midwest Independent Transmission System Operator, 121 FERC ¶ 61,205
FERC Docket No. EL07-86, et al.
Assigned to: Judith Albert
Status: related to D.C. Cir. Nos. 06-1423, et al., in abeyance
Electric Power Supply Ass’n, et al. v. FERC, No. 11-1486, et al. (D.C. Cir. filed 12/23/2011 and later)
-
Regulations requiring that demand response provider, participating in an organized wholesale energy market, be compensated at the market (locational marginal) price, when dispatch of demand response resource is cost-effective and can balance supply and demand. Demand Response Compensation in Organized Wholesale Energy Markets, Order No. 745, 76 Fed. Reg. 16,658 (2011), 134 FERC ¶ 61,187
FERC Docket No. RM10-17
Assigned to: Holly Cafer
Status: motions
El Paso Electric Co. v. FERC , No. 10-1194 (D.C. Cir. filed 7/23/2010)
- Order, after hearing and ALJ Initial Decision, on transmission rights under 1982 Exchange and Transmission Agreement between El Paso and Tucson. El Paso Electric Co. v. Tucson Electric Power Co., 125 FERC ¶ 61,171
FERC Docket No. EL06-45
Assigned to: Robert Kennedy
Status: voluntarily dismissed 10/4/2011
El Paso Natural Gas Co. v. FERC, No. 10-1277 (D.C. Cir. filed 9/3/2010)
-
Continued applicability of Article 11.2 of El Paso’s 1996 Settlement, placing certain limitations on the rates that El Paso can charge in future rate cases to shippers that were parties to the 1996 Settlement. El Paso Natural Gas Co., 114 FERC ¶ 61,290
FERC Docket No. RP05-422
Assigned to: Beth Pacella
Status: consolidated with D.C. Cir. No. 08-1349, et al.; oral argument 10/18/2011
EPIC Merchant Energy, L.P., et al. v. FERC, No. 08-1395 (D.C. Cir. filed 12/23/2008)
-
Order on compliance filing regarding allocation of real-time Revenue Sufficiency Guarantee costs. Midwest Independent Transmission System Operator, Inc., 121 FERC ¶ 61,132
FERC Docket No. ER04-691
Assigned to: Judith Albert
Status: in abeyance; consolidated with D.C. Cir. No. 06-1423
EPIC Merchant Energy, L.P., et al. v. FERC, No. 10-1217 (D.C. Cir. filed 8/2/2010)
-
Complaints regarding allocation of Revenue Sufficiency Guarantee charges to market participants under Midwest ISO tariff. Ameren Services Co., et al. v. Midwest Independent Transmission System Operator, 124 FERC ¶ 61,173
FERC Docket No. EL07-86, et al.
Assigned to: Judith Albert
Status: in abeyance, consolidated with D.C. Cir. No. 09-1066, et al.
EPIC Merchant Energy NJ/PA, LP, et al. v. FERC, No. 11-1275 (D.C. Cir. filed 8/4/2011)
- Dismissal of complaint, similar to earlier complaint, concerning PJM’s method for determining marginal line losses and related charges. EPIC Merchant Energy NJ/PA, LP et al. v. PJM Interconnection, 131 FERC ¶ 61,130
FERC Docket No. EL10-40
Assigned to: Samuel Soopper
Status: consolidated with No. 08-1386; in abeyance
ExxonMobil Gas & Power Marketing Co. and Hess Corp. v. FERC, No. 10-1098 (D.C. Cir. filed 5/14/2010)
- Commission acceptance and suspension of, and hearing on, limited rate filing to establish a mechanism to record and recover hurricane-related costs not recovered from insurance proceeds or third parties (Hurricane Surcharge). Sea Robin Pipeline Co., LLC, 128 FERC ¶ 61,286
FERC Docket No. RP09-995
Assigned to: Kathrine Henry
Status: per curiam judgment dismissing petition, 10/21/2011
F Top of Page
Freeport-McMoran Corp., et al. v. FERC, Nos. 08-1349, et al. (D.C. Cir. filed 11/3/2008 and later)
-
Continued applicability of Article 11.2 of El Paso's 1996 Settlement, placing certain limitations on the rates that El Paso can charge in future rate cases to shippers that were parties to the 1996 Settlement. El Paso Natural Gas Co., 114 FERC ¶ 61,290
FERC Docket No. RP05-422 et al.
Assigned to: Beth Pacella, Lona Perry
Status: oral argument 10/18/2011
Freeport-McMoRan Corp. v. FERC, No. 10-1325 (D.C. Cir. filed 10/14/2010)
-
Approval of contested 2006 Settlement, concerning rates associated with capacity allocation on El Paso system. El Paso Natural Gas Co., 120 FERC ¶ 61,208
FERC Docket No. RP05-422
Assigned to: Beth Pacella, Lona Perry
Status: consolidated with D.C. Cir. No. 08-1349, et al.; oral argument 10/18/2011
G Top of Page
Gerald Richert v. FERC, No. 11-71990 (9th Cir. filed 7/18/2011)
- Relicensing of the City of Tacoma’s Cushman Hydroelectric Project No. 460; objection to settlement that imposes certain groundwater levels and removes obligation to build bridges providing access to certain properties. City of Tacoma, Washington, 132 FERC ¶ 61,037
FERC Docket No. P-460
Assigned to: Judith Albert
Status: briefing
Grand Coulee Project Hydroelectric Authority v. FERC, No. 11-1239 (D.C. Cir. filed 6/20/2011)
- Dismissal of preliminary permit application to study the North Dam Pumped Storage Project, because applicant proposed to use the same water resource being studied under a preliminary permit issued to BPUS Generation for the Banks Lake Storage Project. Grand Coulee Project Hydroelectric Authority, 133 FERC ¶ 62,245
FERC Docket No. P-13681
Assigned to: Holly Cafer
Status: in abeyance
Green Island Power Authority v. FERC, No. 11-1960 (2d Cir. filed 5/13/2011)
- Order reinstating the new license for the School Street Project to the applicant following remand in Green Island Power Authority v. FERC, 577 F.3d 148 (2d Cir. 2009), finding that the relicensing settlement agreement did not materially amend the license application in a manner requiring an opportunity for the public to intervene in the relicensing proceeding and that, in any event, a proffered alternative to replace the project is not a feasible alternative requiring consideration in the proceeding. Erie Boulevard Hydropower, L.P., 131 FERC ¶ 61,036
FERC Docket No. P-2539
Assigned to: Holly Cafer
Status: in abeyance
Green Island Power Authority v. FERC, No. 11-3792 (2nd Cir. filed 9/19/2011)
- Order reinstating the new license for the School Street Project to the applicant following remand in Green Island Power Authority v. FERC, 577 F.3d 148 (2d Cir. 2009), finding that the relicensing settlement agreement did not materially amend the license application in a manner requiring an opportunity for the public to intervene in the relicensing proceeding and that, in any event, a proffered alternative to replace the project is not a feasible alternative requiring consideration in the proceeding. Erie Boulevard Hydropower, L.P., order on remand, 131 FERC ¶ 61,036
FERC Docket No. P-2539
Assigned to: Holly Cafer
Status: briefing; related to 2nd Cir. No. 11-1960
H Top of Page
I Top of Page
Illinois Commerce Comm’n, et al. v. FERC, Nos. 11-3421, et al. (7th Cir. filed 10/27/11 and later)
- Conditional acceptance of revisions to Midwest ISO tariff, finding that Multi Value Project (MVP) transmission planning and cost allocation methodology reasonably would identify projects that provide regional benefits and allocate the costs of those projects among regional beneficiaries. Midwest Independent Transmission System Operator, Inc., 133 FERC ¶ 61,221
FERC Docket No. ER10-1791
Assigned to: Jennifer Amerkhail
Status: motions
Indiana Utility Regulatory Commission v. FERC, No. 10-1313 (D.C. Cir. filed 6/22/2010) (was 7th Cir. No. 10-2512)
- Conditional acceptance of PJM proposal to clarify the right of a retail regulatory authority to prohibit participation of a retail customer in PJM’s demand response programs. PJM Interconnection, LLC, 128 FERC ¶ 61,238
FERC Docket No. ER09-701
Assigned to: Samuel Soopper
Status: oral argument 10/13/2011
J Top of Page
James and Polly Lyons v. FERC, No. 11-1333 (4th Cir. filed 4/21/2011)
-
Finding that licensee (Appalachian) complied with the terms of its license for the Smith Mountain Pumped Storage Project, concerning consistency of project uses (including boat docks) with Shoreline Management Plan. Appalachian Power Co., 133 FERC ¶ 61,135
FERC Docket No. P-2210
Assigned to: Holly Cafer
Status: briefing
K Top of Page
Kern River Gas Transmission Co. v. FERC, No. 11-1332 (D.C. Cir. filed 9/19/2011)
- General rate case filing by Kern River; inclusion of Master Limited Partnerships in proxy group for determining rate of return, and various Period I and II rate design issues.
Kern River Gas Transmission Co., Op. No. 486, 117 FERC ¶ 61,077
FERC Docket No. RP04-274
Assigned to: Lona Perry
Status: dismissed 10/19/2011
Kinder Morgan Interstate Gas Transmission LLC v. FERC, No. 11-1071 (D.C. Cir. filed 3/10/2011)
-
Preliminary finding that Kinder Morgan may be substantially over-recovering its cost of service (in particular, its recovery of lost and unaccounted-for gas); initiation of investigation and hearing on whether Kinder Morgan’s rates remain just and reasonable. Kinder Morgan Interstate Gas Transmission LLC, 133 FERC ¶ 61,157
FERC Docket No. RP11-1494
Assigned to: Robert Kennedy
Status: voluntarily dismissed 10/26/2011
L Top of Page
L.S. Starrett Co. v. FERC, No. 10-1470 (1st Cir. filed 4/15/2010)
- Finding that rehabilitation of Starrett’s Crescent Street Dam Project in Worcester County, Mass., increasing generating/turbine capacity of project, requires FERC license. L.S. Starrett Co., 129 FERC ¶ 62,053
FERC Docket No. UL09-1
Assigned to: Beth Pacella
Status: petition denied 6/15/2011, petition for rehearing denied 8/31/2011
M Top of Page
Maine Pub. Utils. Comm’n, et al. v. FERC, Nos. 06-1403, et al. (D.C. Cir. filed 12/12/2006)
-
On remand from the U.S. Supreme Court in NRG Power Mktg. v. Maine Pub. Utils. Comm’n, 130 S. Ct. 693 (2010); whether auction results and transition payments arising from contested settlement represent contract rates that must be reviewed under Mobile-Sierra public interest standard; if not, whether the Commission has discretion under the circumstances to apply the public interest standard.
Devon Power LLC,
115 FERC ¶ 61,340
FERC Docket No. ER03-563
Assigned to: Robert Solomon
Status: case remanded 11/5/2010
Metro Hydroelectric Co., LLC v. FERC, No. 07-1514 (D.C. Cir. filed 12/17/2007)
-
Termination of Integrated Licensing Process for the Metro Project in Summit County, Ohio, because Metro was unable to conduct certain pre-license application studies. Metro Hydroelectric Co.,
121 FERC ¶ 61,049
FERC Docket No. P-12484
Assigned to: Carol Banta
Status: in abeyance
Mobil Pipe Line Co. v. FERC, No. 11-1021 (D.C. Cir. filed 1/28/2011)
-
Order affirming ALJ’s Initial Decision, following hearing, and denying Mobil’s application for market-based rate authority. Mobil Pipe Line Co., 133 FERC ¶ 61,192
FERC Docket No. OR07-21
Assigned to: Judith Albert, Lona Perry
Status: oral argument 11/17/2011
Modesto Irrigation Dist., et al. v. FERC, No. 09-72775, et al. (9th Cir. filed 5/29/2009 and later)
-
Order on remand from Bonneville Power Admin. v. FERC, 422 F.3d 908 (9th Cir. 2005), rescinding refund obligation of certain non-public utility entities participating in California ISO and PX markets prior to June 20, 2001, and clarifying pricing formulations in California ISO and PX tariffs. San Diego Gas & Electric Co. v. Sellers of Energy, et al., 121 FERC ¶ 61,067
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: motions
Morgan Stanley Capital Group, Inc., et al. v. FERC, Nos. 06-71502, et al. (9th Cir. filed 3/23/2006)
Order on cost filings concerning calculation of refunds in California Refund Proceeding. San Diego Gas & Electric Co., et al., 114 FERC ¶ 61,070
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: motions
Morgan Stanley Capital Group, Inc., et al. v. Public Utility District No. 1 of Snohomish County, Washington, et al., Nos. 06-1457, et al. (S.Ct. filed May 3, 2007)
Application of Mobile-Sierra doctrine to long-term contracts for the wholesale sale of electricity at market-based rates. On petition for cert.; Public Utility Dist. No. 1 v. FERC, 471 F.3d 1053 (9th Cir. 2006), remanding Nevada Power Co., 103 FERC ¶ 61,353
FERC Docket No. EL02-28, et al.
Assigned to: Lona Perry
Status: S.Ct. decision issued 6/28/2008
Moussa I. Kourouma v. FERC, No. 11-1283 (D.C. Cir. filed 8/12/2011)
- Assessment of $50,000 civil penalty for submission of false information in connection with application for market-based rate authority. Moussa I. Kourouma d/b/a Quntum Energy LLC, 135 FERC ¶ 61,245
FERC Docket No. IN11-2
Assigned to: Robert Kennedy
Status: briefing
N Top of Page
New England Power Generators Ass’n, Inc. v. FERC, No. 11-1422 (D.C. Cir. filed 10/31/2011)
- Order on remand from Me. Pub. Utils. Comm’n v. FERC, 625 F.3d 754 (D.C. Cir. 2010), concerning two Mobile-Sierra issues reserved for decision: (1) whether auction results arising from a contested settlement approved by the Commission, establishing the Forward Capacity Market in New England, are tariff rates, not contract rates; and (2) if not contract rates, whether the Commission has discretion to approve a settlement provision imposing a more stringent (public interest) application of the statutory just and reasonable standard of review. Devon Power LLC, 134 FERC ¶ 61,208
FERC Docket No. ER03-563
Assigned to: Lona Perry
Status: motions
New Jersey Board of Public Utilities, et al. v. FERC, Nos. 11-4245, et al. (3rd Cir. filed 11/25/2011 and later)
- Acceptance of PJM’s Minimum Offer Price Rule, imposing a minimum offer screen to determine whether an offer from a new resource is competitive, and designed to ensure that all new resources are offered on a competitive basis without exercise of market power. PJM Interconnection, L.L.C., et al., 135 FERC ¶ 61,022
FERC Docket No. ER11-2875, et al.
Assigned to: Carol Banta
Status: motions
New York Independent System Operator, Inc. v. FERC, No. 11-1114 (D.C. Cir. filed 4/18/2011)
-
Amended regulations, at 18 C.F.R. part 35, to improve the management of risk and use of credit in the organized wholesale electric markets. Credit Reforms in Organized Wholesale Electric Markets, Order No. 741, FERC Stats. & Regs. ¶ 31,317
FERC Docket No. RM10-13
Assigned to: Samuel Soopper
Status: in abeyance
Northern California Power Agency, et al. v. FERC, Nos. 09-71514, et al. (9th Cir. filed 5/15/2009)
-
Conditional approval of contested settlement agreement, distributing funds, from earlier settlements of Gaming and Partnership Proceedings, paid into FERC-controlled accounts to various entities. Duke Energy Trading and Marketing, L.L.C., et al.,, 125 FERC ¶ 61,345
FERC Docket No. EL03-152, et al.
Assigned to: Robert Solomon
Status: in abeyance; related to other 9th Cir. energy crisis approvals
Northern Natural Gas Co. v. FERC, D.C. Cir. No. 11-1484 (D.C. Cir. filed 12/22/2011)
-
Denial of application to abandon jointly-owned facilities – the Matagorda Offshore Pipeline System -- and services. Northern Natural Gas Co., 135 FERC ¶ 61,048
FERC Docket No. CP10-82
Assigned to: Holly Cafer
Status: awaiting schedule
Northern Natural Gas Co. v. FERC, No. 11-1240 (D.C. Cir. filed 6/22/2011)
- Rejection of Northern Natural’s proposal to charge market-based rates for the resale of storage capacity. Northern Natural Gas Co., 133 FERC ¶ 61,210
FERC Docket No. RP10-841
Assigned to: Beth Pacella
Status: briefing
NRG Power Marketing LLC, et al. v. FERC, No. 11-1201 (D.C. Cir. filed 6/1/2011)
- Approval of contested settlement and related transmission service agreements and Joint Operating Agreement Protocol; roll over of transmission service to Consolidated Edison. PJM Interconnection, LLC, et al., 132 FERC ¶ 61,221
FERC Docket No. ER08-858, et al.
Assigned to: Samuel Soopper
Status: briefing
O Top of Page
Occidental Permian Ltd, et al. v. FERC, No. 10-1381 (D.C. Cir. filed 11/9/2010)
-
Conditional authorization to Tres Amigas to sell, at negotiated rates, transmission services on proposed superstation connecting the three continental interconnections and allowing the transmission of intermittent wind and solar generation. Tres Amigas LLC, 130 FERC ¶ 61,207
FERC Docket No. ER10-396
Assigned to: Jennifer Amerkhail
Status: oral argument 2/14/2012
Otter Tail Corp., et al. v. FERC, Nos. 08-1002, et al. (D.C. Cir. filed 1/4/2008)
-
Order on proposed revisions to Midwest ISO Tariff (TEMT) to amend and clarify provisions of its real-time revenue sufficiency guarantee. Midwest Independent Transmission System Operator, Inc., 115 FERC ¶ 61,108
FERC Docket No. ER04-691
Assigned to: Judith Albert
Status: in abeyance; consolidated with D.C. Cir. No. 06-1423
Otter Tail Power Co., et al. v. FERC, Nos. 09-1209, et al. (D.C. Cir. filed 7/24/2009 and later)
-
Order on proposed revisions to Midwest ISO Tariff to amend and clarify provisions of its real-time Revenue Sufficiency Guarantee; order on compliance filing regarding allocation of real-time RSG costs. Midwest Independent Transmission System Operator, et al. ,115 FERC ¶ 61,108
FERC Docket No. ER04-691, et al.
Assigned to: Judith Albert
Status: motions; related to D.C. Cir. No. 06-1423, et al.
Ozark Gas Transmission, L.L.C. v. FERC, No. 11-1091 (D.C. Cir. filed 3/28/2011)
-
Preliminary finding that Ozark may be substantially over-recovering its cost of service (in particular, its recovery of lost and unaccounted-for gas); initiation of investigation and hearing on whether Ozark’s rates remain just and reasonable. Ozark Gas Transmission, L.L.C., 133 FERC ¶ 61,158
FERC Docket No. RP11-1495
Assigned to: Robert Kennedy
Status: voluntarily dismissed 10/6/2011
P Top of Page
Pacific Gas and Electric Co., et al. v. FERC, Nos. 06-71888, et al. (9th Cir. filed 4/6/2006 and later)
-
Order denying rehearing and granting clarification on treatment of emissions costs of LADWP during 10/2/00-6/20/01 refund period. San Diego Gas & Electric Co., et al., 112 FERC ¶ 61,323
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
Pacific Gas and Electric Co. v. FERC, No. 06-71320 (9th Cir. filed 3/14/2006)
Order on submission of fuel cost allowance claims. San Diego Gas & Electric Co., et al., 114 FERC ¶ 61,223
Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: motions
Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71831, et al. (9th Cir. filed 4/1/2005 and later)
-
Order on rehearing of refund calculation issues. San Diego Gas & Electric Co., et al., 109 FERC ¶ 61,218
FERC Docket Nos. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71761, et al. (9th Cir. filed 3/29/2005 and later)
-
Order on rehearing on submission of fuel cost allowance claims. San Diego Gas & Electric Co., et al., 109 FERC ¶ 61,297
FERC Docket Nos. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71436, et al. (9th Cir. filed 3/14/2005 and later)
-
Termination of investigations into anomalous bidding behavior by suppliers into Western energy markets. Investigation of Anomalous Bidding Behavior and Practices in the Western Markets, 110 FERC ¶ 61,369
FERC Docket Nos. IN03-10, et al.
Assigned to: Robert Solomon
Status: in abeyance
Pacific Gas and Electric Company, et al. v. FERC, Nos. 04-75609, et al. (9th Cir. filed 11/4/2004)
-
Review of fuel cost allowance claims by independent auditors. San Diego Gas & Electric Co., et al., 108 FERC ¶ 61,219
FERC Docket Nos. EL00-95, et al.
Assigned to: Robert Solomon
Status: briefing stayed
Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-74984, et al. (9th Cir. filed 9/29/2004 and later)
-
Clarification of fuel cost allowance issues in calculation of
MMCP refund methodology. San Diego Gas & Electric Co., et
al., 107
FERC ¶ 61,166
FERC Docket Nos. EL00-95, et al.
Assigned to: Robert Solomon
Status: briefing stayed
Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-72539, et al. (9th Cir. filed 5/21/2004 and later)
-
Order clarifying methodology for calculating fuel cost allowances
and requiring verification by an independent auditor. San
Diego Gas & Electric Co., et al., 107
102 FERC ¶ 61,317
FERC Docket Nos. EL00-95, et al.
Assigned to: Robert Solomon
Status: briefing stayed
Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-71019, et al. (9th Cir. filed March 4, 2004)
-
Order granting interlocutory appeal and clarifying scope of
discovery in partnership gaming show cause proceeding. Enron
Power Marketing, Inc., et al., 105
FERC ¶ 61,362
FERC Docket Nos. EL03-180, et al.
Attorney: Robert Solomon
Status: briefing stayed
Pacific Gas and Electric Co., et al. v. FERC, Nos. 04-72381, et al. (9th Cir. filed 5/12/2004)
-
Public release of most, but not all, documents relating to investigation
of possible manipulation of energy prices in the West during
2000-2001. Fact-Finding Investigation of Potential Manipulation
of Electric and Natural Gas Prices, 107
FERC ¶ 61,108
FERC Docket Nos. PA02-2, et al.
Assigned to: Robert Solomon
Status: appeals stayed 8/26/2004
Pacific Gas and Electric Co., et al. v. FERC, Nos. 05-71008, et al. (9th Cir.)
-
Initiation of evidentiary show cause proceedings as to whether
power trading companies engaged in gaming and/or anomalous market
behavior, in violation of applicable tariffs, in western energy
markets in 2000-2001. American Electric Power Service Corp.,
et al., 103
FERC ¶ 61,345
FERC Docket Nos. EL03-137, et al.
Assigned to: Robert Solomon
Status: appeals consolidated and briefing stayed 4/5/2005
Pacific Gas and Electric Co., et al. v. FERC, Nos. 03-72874, et al. (9th Cir., filed Aug. 7, 2003 and later).
-
Approval of Settlement Agreements with Reliant and Duke; denial
of late intervention and party status to California Parties
and other movants. Fact Finding Investigation into Possible
Manipulation of Electric and Natural Gas Prices, 102
¶ FERC 61,108
FERC Docket Nos. PA02-2, EL03-59, et al.
Assigned to: Robert Solomon
Status: briefing; oral argument 12/8/2004; Duke appeals withdrawn
People of the State of California, et al. v. FERC, No. 11-71542 (9th Cir. filed 6/2/2011)
- Order on remand from Pub. Util. Comm’n of Cal. v. FERC, 462 F.3d 1027 (9th Cir. 2006), establishing an evidentiary, trial-type hearing before an ALJ on additional refund issues and clarifying scope of hearing. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 129 FERC ¶ 61,147
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
People of the State of California, et al. v. FERC, Nos. 10-71708, et al. (9th Cir. filed 5/26/2010 and later)
- Orders addressing requests for cost offsets from refunds by sellers seeking to demonstrate that the refund methodology applied to the relevant California markets from 10/2/00 through 6/20/10 resulted in an overall revenue shortfall for their transactions in those markets during that time. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 127 FERC ¶ 61,269
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
People of the State of California, et al. v. FERC, No. 10-71909 (9th Cir. filed 6/17/2010)
- Commission resolution of requests by parties seeking designation as non-public utilities for purposes of the California refund proceedings; determination that the Arizona Electric Power Cooperative should be designated a non-public utility. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 121 FERC ¶ 61,067
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
People of the State of California, et al. v. FERC, No. 08-74306 (9th Cir. filed 10/14/2008)
-
Order on remand from State of California ex rel. Lockyer v. FERC, 383 F.3d 1006 (9th Cir. 2004), setting for hearing violations of market-based rate quarterly reporting requirements during 2000-2001 and whether improper or untimely quarterly reporting masked an accumulation of market power, thus causing market-based rates to be unjust and unreasonable. State of California, ex rel. Bill Lockyer, Attorney General v. British Columbia Power Exchange Corp., et al.,
122 FERC ¶ 61,260
FERC Docket No. EL02-71
Assigned to: Robert Solomon
Status: in abeyance
People of the State of California ex rel. Bill Lockyer, Attorney General, et al. v. FERC, Nos. 05-75487 (9th Cir. filed 9/16/2005 and later)
-
Clarification of scope of proceeding as to Enron's market behavior in violation of tariffs. El Paso Electric Co., et al., 111 FERC ¶ 61,221
FERC Docket Nos. EL02-113, et al.
Assigned to: Patrick Lee; Robert Solomon
Status: in abeyance
People of the State of California ex rel. Bill Lockyer, et al. v. FERC, Nos. 04-76229, et al. (9th Cir. filed 12/12/2004 and later)
-
Order on rehearing of refund calculation issues. San
Diego Gas & Electric Co., et al., 107
FERC ¶ 61,165
FERC Docket Nos. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
People of the State of California, ex rel. Bill Lockyer, Attorney General, et al. v. FERC, Nos. 04-75295, et al. (9th Cir. filed 10/18/04 and later)
-
Denial of California Parties’ request for consolidation
of refund and investigative proceedings. San Diego Gas &
Electric Co., et al., 103 FERC ¶ 61,359
FERC Docket Nos. EL00-95, et al.
Assigned to: Robert Solomon
Status: transferred to D.C. Circuit 4/13/2005
Port of Seattle, Washington, et al. v. FERC, Nos. 06-75708, et al. (9th Cir. filed 12/18/2006 and later)
-
Approval of contested settlements between Enron, FERC Staff, Valley Electric Ass'n, and City of Santa Clara, California. Enron Power Marketing, Inc., et al.,
115 FERC 61,376
FERC Docket Nos. EL03-180, et al.
Assigned to: Robert Solomon
Status: motions
Port of Seattle v. FERC, No. 06-74383 (9th Cir. filed 8/31/2006)
Approval of contested settlements between Enron, FERC Staff, Valley Electric Ass'n, and City of Santa Clara, California. Enron Power Marketing, Inc., et al., 115 FERC ¶ 61,376
FERC Docket No. EL03-180, et al.
Assigned to: Robert Solomon
Status: motions
Port of Seattle, Washington v. FERC, No. 06-72957 (9th Cir. filed 6/7/2006)
-
Approval of global settlement of disputes between Reliant, California Parties and FERC Staff. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al.,
113 FERC ¶ 61,308
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
Port of Seattle, Washington v. FERC, Nos. 06-75039, et al. (9th Cir. filed 10/25/2006 and later)
-
Approval of contested settlement of disputes between energy suppliers and FERC Staff. Mirant Energy Marketing, L.P., et al.,111 FERC ¶ 61,488
FERC Docket No. EL03-158, et al.
Assigned to: Robert Solomon
Status: in abeyance
Port of Seattle, Washington v. FERC, No. 06-72649 (9th Cir. filed 5/23/2006)
-
Approval of contested settlement between Enron, California
Parties and FERC Staff. San Diego Gas & Electric Co.
v. Sellers of Energy and Ancillary Services, et al.,
113 FERC ¶ 61,171
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
Potter Township Hydroelectric Auth. v. FERC, No. 00-1333 (D.C. Cir., filed Jul. 27, 2000).
-
Petitioner challenges Commission orders denying its request
for an extension of time to commence construction of the Emsworth
Lock and Dam Hydroelectric Project, in order to avoid termination
of is license. Potter Township Hydroelectric Auth.,
90
FERC ¶ 61,312 [TIF] (2000), reh'g denied by operation of law, 91
FERC ¶ 61,190 [TIF] (2000).
FERC Docket No. P-7041
Assigned to: Lona Perry
Status: in abeyance
PPL EnergyPlus, LLC v. FERC, No. 11-1341 (D.C. Cir. filed 9/23/2011)
- Dismissal of PPL complaint regarding PJM’s modeling of outages of two months or more in its simultaneous feasibility tests for financial transmission rights and auction revenue rights; failure to model the Meadowbrook-Morrisville 500 kV construction-related transmission outage in PJM feasibility tests conducted for 2010/2011 auctions. PPL EnergyPlus, LLC v. PJM Interconnection, 134 FERC ¶ 61,263
FERC Docket No. EL11-25
Assigned to: Carol Banta
Status: awaiting schedule
PSEG Energy Resources & Trade, et al. v. FERC, No. 10-1103 (D.C. Cir. filed 5/20/2010)
-
Order accepting ISO New England’s first Forward Capacity Auction, for the 2010-2011 Capacity Commitment Period. ISO New England, Inc., 123 FERC ¶ 61,290
FERC Docket No. ER08-633
Assigned to: Jennifer Amerkhail
Status: oral argument 9/22/2011
Public Citizen Inc., et al. (was Montana Consumer Counsel) v. FERC, No. 08-71827 (9th Cir. filed 5/1/2008)
-
Rulemaking codifying and, in certain respects, modifying FERC standards for obtaining and retaining market-based rates for public utilities, at 18 CFR, Part 35, Subpart H. Market-Based Rates for Wholesale Sales of Electric Energy by Public Utilities, Order 697, 119 FERC ¶ 61,295
FERC Docket No. RM04-7
Assigned to: Carol Banta, Robert Solomon
Status: petition denied 10/13/2011
Public Service Commission of the State of New York, et al. v. FERC, Nos. 08-1366, et al. (D.C. Cir. filed 11/21/2008 and later)
-
Conditional approval of NY ISO proposals to strengthen market mitigation in New York City (in-city) installed capacity market. New York Independent System Operator, Inc., 122 FERC ¶ 61,211
FERC Docket No. EL07-39, et al.
Assigned to: Jennifer Amerkhail
Status: in abeyance
Public Service Elec. and Gas Co., et al. v. FERC, Nos. 07-1210, et al. (D.C. Cir. filed 6/18/2007 and later)
-
Complaint proceeding concerning two 1970s-era contracts providing for PSE&G to receive up to 1000 MW of power from ConEd in upstate New York and to redeliver same amount of power to ConEd in New York City; protocols governing each party's responsibilities in performing contractual wheeling. Consolidated Edison Co. of New York v. Public Service Electric and Gas Co., Op. 476,
108 FERC ¶ 61,120
FERC Docket No. EL02-23
Assigned to: Lona Perry
Status: in abeyance
Public Utilities Comm'n of California v. FERC, No. 08-1261 (D.C. Cir. filed 8/8/2008)
-
Declaratory order approving incentive rate treatments for certain transmission projects, consistent with Order 679. Southern California Edison Co., 121 FERC ¶ 61,168
121 FERC ¶ 61,168
FERC Docket No. EL07-62
Assigned to: Samuel Soopper
Status: in abeyance
Public Utilities Commission of California, et al. v. FERC, Nos. 03-74207, et al. (9th Cir. filed November 17, 2003 and later)
-
Denial of complaints seeking modification of long-term contracts,
executed in early 2001 at height of California energy crisis
between the California Department of Water Resources and five
wholesale energy suppliers. Public Utilities Commission
of the State of California v. Sellers of Long Term Contracts
to the California Department of Water Resources, et al., 103
FERC ¶ 61,354
FERC Docket Nos. EL02-60, et al.
Assigned to: Lona Perry
Status: briefing; oral argument 12/8/2004
Public Utilities Commission of the State of California, et al. v. FERC, Nos. 01-71051, et al. (9th Cir., filed June 29, 2001 and later)
-
Numerous petitioners challenge various aspects of the Commission's
market mitigation and monitoring plan for the California and
Western wholesale electricity markets. San Diego Gas &
Elec. Co., et al., 93
FERC ¶ 61,294 [TIF] (2000); 95
FERC ¶ 61,115
FERC Docket Nos. EL00-95, et al.
Assigned to: Dennis Lane, Robert Solomon, Beth Pacella
Status: Case management conferences 9/21/2004 and 11/9/2004; briefing on Phase One “scope” issues; oral argument 4/12-13/2005
Public Utility District of Snohomish County, Wash. v. FERC, No. 11-71366 (9th Cir. filed 5/12/2011)
- Direction to Electric Reliability Organization to revise the definition of the term “bulk electric system” through the ERO’s Reliability Standards Development Process to address the Commission’s policy and technical concerns and ensure that the definition encompasses all facilities necessary for operating an interconnected electric transmission network. Revision to Electric Reliability Organization Definition of Bulk Electric System, Order No. 743, 133 FERC ¶ 61,150
FERC Docket No. RM09-18
Assigned to: Lona Perry
Status: in abeyance; unopposed motion to transfer to D.C. Circuit granted 8/16/2011
Q Top of Page
R Top of Page
S Top of Page
Sacramento Municipal Utility District v. FERC, Nos. 09-1279 and 09-1280 (D.C. Cir. filed 11/12/2009)
- Approval of settlements of disputes among California Parties, Puget Sound Energy, and AES Placerita. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., 128 FERC ¶ 61,002
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: motions
Sacramento Utility Municipal District v. FERC, Nos. 10-71251, et al. (9th Cir. filed 4/19/2010 and later)
- Approval of settlements of California energy crisis disputes among California Parties and various energy suppliers. San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al.,,
129 FERC ¶ 61,256
FERC Docket No. EL00-95, et al.
Assigned to: Robert Solomon
Status: in abeyance
Southern California Edison Co. v. FERC, No. 11-1471 (D.C. Cir. filed 12/5/2011)
- Order approving a base return on equity of 9.54 percent for three of Southern California Edison’s transmission projects. Southern California Edison Co., 131 FERC ¶ 61,020
FERC Docket No. ER08-375, et al.
Assigned to: Samuel Soopper
Status: briefing
St. Regis Mohawk Tribe, et al. v. FERC, No. 04-4231 (2nd Cir. filed 8/13/2004)
-
New license for NYPA's continued operation of the St. Lawrence-FDR
Project; allocation of project power to neighboring states.
New York Power Authority, et al., 105
FERC ¶ 61,102
FERC Docket Nos. P-2000 and EL03-224
Assigned to: Robert Solomon
Status: in abeyance
T Top of Page
TC Ravenswood, LLC v. FERC, No. 12-1008 (D.C. Cir. filed 1/6/2012)
-
Updates to the demand curve rates for the installed capacity (ICAP) market administered by the New York ISO. New York Independent System Operator, Inc., 134 FERC ¶ 61,058
FERC Docket No. ER11-2224
Assigned to: Jennifer Amerkhail
Status: motions
TC Ravenswood, LLC v. FERC, No. 11-1258 (D.C. Cir. filed 7/12/2011)
- Conditional acceptance of proposal by New York ISO to implement market mitigation measures for generators located in the rest-of-state (outside New York City and Long Island) capacity region in New York. New York Indep. System Operator, Inc., 133 FERC ¶ 61,030
FERC Docket No. ER10-2220
Assigned to: Jennifer Amerkhail
Status: briefing
TC Ravenswood, LLC v. FERC, No. 11-1305 (D.C. Cir. filed 8/25/2011)
- Acceptance in part and rejection in part of proposal by New York ISO to strengthen market power mitigation in New York City (in-city) installed capacity market. New York Independent System Operator, Inc., 133 FERC ¶ 61,178
FERC Docket No. ER10-3043
Assigned to: Jennifer Amerkhail
Status: motions
Terra-Gen Dixie Valley, LLC v. FERC, No. 11-1259 (D.C. Cir. filed 7/12/2011)
- Transmission rights to existing and future planned capacity on Dixie Valley's existing 212-mile, 230 kV radial generator tie line; filing of open access transmission tariff to govern the rates, terms and conditions of future transmission service on the Dixie Valley line. Terra-Gen Dixie Valley, LLC, 134 FERC ¶ 61,027
FERC Docket No. EL11-37, et al.
Assigned to: Jennifer Amerkhail
Status: in abeyance
Texas Pipeline Ass’n, et al. v. FERC , Nos. 10-60066, et al. (5th Cir. filed 1/27/2010 and later)
-
Modification of regulations concerning obligation of pipelines to post daily scheduled volume information and other data for certain points, to facilitate price transparency in FERC-regulated markets. Pipeline Posting Requirements Under Section 23 of the Natural Gas Act, Order No. 720, 73 Fed. Reg. 73,494, 125 FERC ¶ 61,211
FERC Docket No. RM08-2
Assigned to: Beth Pacella, Samuel Soopper, Robert Solomon
Status: petition granted 10/24/2011; court order granting FERC motion to clarify, issued 12/20/2011
The Empire District Electric Co., et al. v. FERC, No. 11-3715 (8th Cir. filed 12/13/2011)
- Order accepting Southwest Power Pool’s Highway/Byway method of cost allocation. Southwest Power Pool, Inc., 131 FERC ¶ 61,252
FERC Docket No. ER10-1069
Assigned to: Jennifer Amerkhail
Status: in abeyance
Transmission Agency of Northern California, et al. v. FERC, Nos. 09-1213, et al. (D.C. Cir. filed 8/5/2009 and later)
-
Conditional acceptance of proposed tariff revisions submitted by the California ISO to establish an Integrated Balancing Authority Area, modeling and pricing export and import transactions with the SMUD and Turlock balancing authority areas. California Independent System Operator Corp., 124 FERC ¶ 61,271
FERC Docket No. ER08-1113
Assigned to: Samuel Soopper
Status: petition for certiorari denied 6/13/2011
Turlock Irrigation District v. FERC, No. 10-1008 (D.C. Cir. filed 1/12/2010)
-
Conditional acceptance, subject to modification, of California ISO compliance tariff filing; pricing under Market Efficiency Enhancement Agreement for resources within the Integrated Balancing Authority Area. California Indep. System Operator Corp., 126 FERC ¶ 61,207
FERC Docket No. ER08-1113
Assigned to: Samuel Soopper
Status: voluntarily dismissed 7/8/2011
U Top of Page
United Water Conservation District v. FERC and National Marine Fisheries Service, No. 10-1027 (D.C. Cir. filed 2/12/2010)
-
Relicensing of Santa Felicia Project, on Piru Creek in Ventura County, Cal.; objections to biological opinion, concerning endangered steelhead trout, prepared by the National Marine Fisheries Service under the Endangered Species Act. United Water Conservation District, 124 FERC ¶ 62,193
FERC Docket No. P-2153
Assigned to: Beth Pacella
Status: in abeyance
Upper Yampa Water Conservancy District v. FERC, No. 11-9583 (10th Cir. filed 12/19/2011)
-
Denial of application to sell, lease or otherwise remove project lands within the licensed boundary of the Stagecoach Project on the Yampa River in Routt County, Colorado. Upper Yampa Water Conservation District, 136 FERC ¶ 62,217
FERC Docket No. P-9202
Assigned to: Judith Albert
Status: briefing
V Top of Page
Valero Marketing and Supply Co. v. FERC, No. 11-1266 (D.C. Cir. filed 7/22/2011)
- Five-year review of oil pricing index, following consideration of comments, setting index ceiling level at Producer Price Index for Finished Goods plus 2.65 percent. Five-Year Review of Oil Pipeline Index, 133 FERC ¶ 61,228
FERC Docket No. RM10-25
Assigned to: Lona Perry
Status: briefing
W Top of Page
Williams Alaska Petroleum Inc. v. FERC and United States of America, No. 07-1421 (D.C. Cir. filed 10/18/2007)
-
Motion for ruling on retroactive calculations concerning TAPS Quality Bank. Trans Alaska Pipeline System,
119 FERC ¶ 61,254
FERC Docket No. OR89-2
Assigned to: Beth Pacella
Status: in abeyance