Incident Description
FERC Independent Panel of Consultants (IPOC) Report, May 25, 2006
Note: All files below are PDFs.
- » 1. Introduction
- » 2. Project Description
- » 3. Design, Construction History and Performance
- » 4. Standard Operating Procedure
- » 5. Overpumping Protective Systems
- » 6. December 14, 2005 Breach
- » 7. Technical Cause of Breach
- » 8. Conclusions
- » Appendix A - IPOC Information Request Letter
- » Appendix B - Event Chronology
- » Appendix C - Early Project Correspondence (4.9 MB)
- » Figures (2.8 MB)
- » Full Report (5.4 MB)