Industries
Projects
Dam Breach Incident
Incident Description
AmerenUE Consultant's Report, Submitted to FERC April 7, 2006
Note: All files below are PDFs.
- 1.0 Introduction
- 2.0 Summary Description of the Taum Sauk Plant
- 3.0 Summary Description of the Site Geology
- 4.0 Description of the December 14, 2005 Incident
- 5.0 Overall Approach to Root Cause Analysis
- 6.0 Definition of the Upper Reservoir Barriers
- 7.0 Site Investigation of Upper Reservoir Barriers
- 8.0 Analysis of Upper Reservoir Barriers (1.5 MB)
- 9.0 Operation and Control at Taum Sauk
- 10.0 Summary Results of Barrier Analysis
- 11.0 Conclusions and Acknowledgements
- References and Plates (2.5 MB)
- Appendix A - Siemens Report March 24, 2006 AmerenUE
- Appendix B - May 15, 1964 "Pickel Report"
- Appendix C - Gouhou Dam Paper
- Appendix D - Boring Logs
- Appendix E - Laboratory Test Data (29 MB)
- Appendix F - Calculations (4.5 MB)
- Appendix G - Instrument and Support Drawings