Federal Energy Regulatory Commission skip navigation



 
Text Size small medium large
The Integrated Licensing Process (ILP) - Tutorial

Processing the License Application

Application Contents [see 18 CFR 5.18 External Link]

The application must contain all information required in 18 CFR 5.18, including maps and drawings that permit Commission staff to determine: a) the location of the project and the extent of land area affected by the project, and b) the proposed design of all power producing structures and equipment. See ILP Application Checklist PDF

For instructions on how to file exhibit drawings, see: Preparing Exhibit Drawings for a License or Exemption Application




CONTACT
David Turner
Telephone: 202-502-6091
Email: david.turner@ferc.gov
 
THE INTEGRATED LICENSING PROCESS (ILP)

Main Page

  • Overview


  • Preparing an Application Processing the License Application
     


    Updated: October 3, 2012