Enbridge Pipelines (AlaTenn) L. L. C.
FOURTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP09-619-000, Status: Effective
Fourth Revised Sheet No. 197 Fourth Revised Sheet No. 197
Superseding: Third Revised Sheet No. 197
GENERAL TERMS AND CONDITIONS (continued)
36. North American Energy Standards Board ("NAESB") Standards
Pursuant to Order Nos. 587, et al, promulgated by the FERC in
Docket No. RM96-1, for NAESB Wholesale Gas Quadrant (WGQ)
Standards that do not otherwise require implementing tariff
provisions, the following NAESB WGQ Standards are hereby
incorporated by reference into Transporter's FERC Gas Tariff.
Unless specifically indicated otherwise, all incorporated
standards are as reflected in NAESB Version 1.8 .
0.1.1-3 1.3.79 3.3.14-17 5.1.1-4
0.2.1-3 1.4.1-7 3.3.20-26 5.2.1-2
0.3.1-6 2.1.1-6 3.4.1-4 5.3.4-5
0.3.10 2.2.1-3 4.1.2-4 5.3.8-12
0.3.11-15 2.3.1-3 4.1.6-7 5.3.14
0.4.1 2.3.5 4.1.10 5.3.17-22
1.1.1-5 2.3.7-10 4.1.12-13 5.3.23-25
1.1.7 2.3.11-15 4.1.15-24 5.3.26-33
1.1.9-18 2.3.17-23 4.1.26-40 5.3.34-43
1.1.20-22 2.3.25 4.2.1-20 5.3.45-52
1.2.1-4 2.3.27-35 4.3.1-3 5.3.55
1.2.5-6 2.3.45-46 4.3.5 5.3.57-58
1.2.8-12 2.3.48-50 4.3.16-18 5.4.1-23
1.2.13-19 2.3.51-58 4.3.20
6.3.1-4
1.3.4-5 2.3.62-65 4.3.22-36 6.5.2-4
1.3.7-9 2.4.1-18 4.3.38-62 10.1.1-9
1.3.11 3.1.1-2 4.3.65-69 10.2.1-38
1.3.13-18 3.2.1 4.3.72-76 10.3.1
1.3.22-32 3.3.1-9 4.3.78-87 10.3.3-25
1.3.33-77 3.3.10-13 4.3.89-93