Enbridge Pipelines (AlaTenn) L. L. C.

FOURTH REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/11/2002, Docket: RP03- 40-000, Status: Effective

Original Sheet No. 154 Original Sheet No. 154 : Effective

 

GENERAL TERMS AND CONDITIONS (continued)

 

 

4.8 Correction of metering errors-adjustments: Measurement data

corrections should be processed within six (6) months from the end

of the production month, unless (i) Transporter, Shipper and

Operator mutually agree otherwise or (ii) the correction is the

result of a deliberate omission or misrepresentation by a Party or

a mutual mistake of fact. Prior period measurement adjustments

will be taken back to the production flow month and reflected as

such on invoices, imbalance statements and allocation statements.

In all instances where a correction is made, Shipper, Transporter

or Operator, as applicable, shall have a 3 month rebuttal period.

Parties' other statutory or contractual rights shall not otherwise

be diminished by this standard.

 

4.9 Preservation of metering records: Transporter and Shipper shall

each preserve for a period of at least one (1) year all test data,

charts, and other similar records.