Enbridge Pipelines (AlaTenn) L. L. C.
FOURTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2009, Docket: RP09-336-000, Status: Effective
Second Revised Sheet No. 134 Second Revised Sheet No. 134
Superseding: First Revised Sheet No. 134
GENERAL TERMS AND CONDITIONS (continued)
ii) Releases made pursuant to this Section 3.10(a) may not be
rolled-over, renewed or otherwise extended beyond the term
described in Section 3.10(a)(i)(aa), unless the Replacement
Shipper agrees to pay the applicable maximum rate and meets
all other terms and conditions of the release request, or
the Releasing Shipper follows the prior posting and bidding
procedures set forth herein; provided that the Releasing
Shipper may use this Section 3.10 to release the capacity
again to the same Replacement Shipper commencing twenty-
eight (28) days from the end of the original release.
iii) Releasing Shipper shall post the terms of a release under
this Section 3.10(a) on Transporter's EBB and/or Internet
Web site system no later than forty-eight (48) hours after
the commencement of the release transaction.
(b) Maximum Rate Prearranged Bidder
i) Competitive bidding for released capacity will not be
required if the release is a permanent release or if the
term of the release is for more than one (1) year, and if:
aa) a "Prearranged Replacement Shipper" has agreed to pay
Transporter's maximum applicable rates and agrees to
all of the other terms and conditions of the release
as specified by the Releasing Shipper;
bb) the Releasing Shipper provides Transporter with the
information specified in Section 3.8(a), (b), (c),
(d), (e), (f), (g) (h), (i), (k) and (n) with respect
to the particular release; and
cc) in the instance of a temporary release, prior to the
commencement of service: (y) if the Releasing Shipper
elects, the Releasing Shipper, the Prearranged
Replacement Shipper and Transporter enter into a
three-party contract for the released