Enbridge Pipelines (AlaTenn) L. L. C.

FOURTH REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2009, Docket: RP09-336-000, Status: Effective

First Revised Sheet No. 131 First Revised Sheet No. 131

Superseding: Original Sheet No. 131

 

GENERAL TERMS AND CONDITIONS (continued)

 

recall or reput of the capacity and if a partial day recall of

capacity is allowed, If a partial day recall of capacity is

allowed, is the capacity subject to reput after the recall has

ended;

 

(g) whether contingent bids will be accepted for evaluation and, if

so, the terms and conditions on which the contingent bids will be

evaluated including, among other things; (1) whether the

contingency can extend beyond the Bidding period and (2) whether,

and for what time period, the next highest bidder will be

obligated to acquire the capacity should the winning contingent

bidder exercise its option not to take the capacity;

 

(h) whether the release is contingent on the Releasing Shipper's

ability to release associated capacity on another pipeline and, if

so, all terms and conditions associated with such contingency;

 

(i) whether bids based on a one part volumetric rate will be accepted

and any special conditions associated with release on a volumetric

basis including any minimum volumetric commitment, expressed as a

quantity or as a percentage. Provided, that, in the case of a

release with a term of more than one (1) year , the maximum rate

for the release, including any surcharges, shall not be more than

Transporter's maximum demand rate for service under Rate Schedule

FT, including any applicable surcharges, computed using a 100%

load factor basis (which is equal to Transporter's applicable

maximum IT rate as stated on the currently effective Sheet No.4);

 

(j) any objective, non-discriminatory bid evaluation method which the

Releasing Shipper desires to utilize to determine the award of

released transportation rights;

 

(k) the manner in which any refunds in rates and charges ordered by

FERC with respect to the released capacity will be distributed by

Releasing Shipper to Replacement Shipper;

 

(l) an irrevocable statement that after the close of the applicable

Bidding Period, the Releasing Shipper shall release its

transportation rights on the terms set forth in its Release

Request if all such terms are accepted by a Bidder and such Bidder

otherwise qualifies for such transportation service under

Transporter's Tariff;