Enbridge Pipelines (AlaTenn) L. L. C.

FOURTH REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2005, Docket: RP05-442-000, Status: Effective

First Revised Sheet No. 37 First Revised Sheet No. 37 : Effective

Superseding: Original Sheet No. 37

RATE SCHEDULE FT-SG (continued)

 

4. DELIVERY AND RECEIPT POINTS; PRESSURE; UNIFORM QUANTITIES

 

4.1 Receipt Points: The Primary Receipt Point(s) for all gas

transported by Transporter under this Rate Schedule shall be at a

mutually agreeable interconnection between Transporter's

facilities and the facilities of the upstream pipeline system

providing service as shown in Exhibit A to the FT-SG Contract.

The total quantity specified at the Primary Receipt Point(s) must

equal the sum of the Contract Demand and Fuel and Losses

requirement set forth in Section 8 of this Rate Schedule.

Transporter shall not be required under any circumstances to

receive gas at any Receipt Point(s) where the total quantity of

gas scheduled for receipt on any day is less than that required

for the accurate measurement of quantities to be received.

 

4.2 Delivery Points: The Primary Delivery Point(s) for all gas

transported by Transporter under this Rate Schedule shall be at a

mutually agreeable interconnection between Transporter's

facilities and the facilities of Shipper or Shipper's designee as

shown in Exhibit B to the FT-SG Contract. The total quantity

specified at the Primary Delivery Point(s) must equal the Contract

Demand stated in the FT-SG Contract. Transporter shall not be

required under any circumstances to deliver gas at any Delivery

Point where the total quantity of gas scheduled for delivery in

any day is less than that required for the accurate measurement of

quantities to be delivered.