Enbriidge Pipelines (Midla) L. L. C.

Third Revised Volume No. 2

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/11/2002, Docket: RP03- 39-000, Status: Effective

Original Sheet No. 79 Original Sheet No. 79 : Effective

 

 

 

RATE SCHEDULE X-8

(Continued)

 

 

and prudent operation of Southern's facilities and the right to make

nominal sales of gas to others for drilling fuel, lease operations, pumping

stations and other similar purposes. It is also recognized that some losses

of gas volumes and liquefiable hydrocarbons may occur as a result of such

sales and in the operation of such facilities. Enbridge Pipelines (Midla),

L.L.C.'s (formerly known as Mid Louisiana) proportionate part of the

liquefiable hydrocarbons so used or lost shall be deducted from the quantity

of liquefiable hydrocarbons otherwise deliverable to Enbridge Pipelines

(Midla), L.L.C. (formerly known as Mid Louisiana) for processing hereunder.

 

7. Responsibility - All Plant operations conducted by or on behalf of

Enbridge Pipelines (Midla), L.L.C. (formerly known as Mid Louisiana) shall be

at its sole cost, risk and expense, and, as between Enbridge Pipelines

(Midla), L.L.C. (formerly known as Mid Louisiana) and Southern, Enbridge

Pipelines (Midla), L.L.C. (formerly known as Mid Louisiana) shall be

responsible for the safe handling of the gas while it is in Enbridge Pipelines

(Midla), L.L.C.'s (formerly known as Mid Louisiana) custody (or the custody of

another on Enbridge Pipelines (Midla), L.L.C.'s (formerly known as Mid

Louisiana) behalf) for processing.

 

ARTICLE IX

 

TERM OF AGREEMENT

 

 

This Agreement shall be effective for a primary term beginning on the

date of initial deliveries hereunder and continuing for a period of ten

(10) years, and it shall continue in effect thereafter for an additional

term of five (.5) years at either party's election.

 

 

ARTICLE X

 

RESPONSIBILITY FOR GAS

 

 

As between Enbridge Pipelines (Midla), L.L.C. (formerly known as Mid

Louisiana) and Southern, the party in control and possession of gas shall be

responsible for any injuries, claims, liabilities or damages (except

consequential damages) caused thereby until the gas shall have been delivered

to the other. The point of possession shall be that flange or weld which

connects the facilities of the receiving party with the facilities through

which the gas is delivered.