Enbriidge Pipelines (Midla) L. L. C.
Third Revised Volume No. 2
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/11/2002, Docket: RP03- 39-000, Status: Effective
Original Sheet No. 31 Original Sheet No. 31 : Effective
RATE SCHEDULE X-3
(Continued)
I. At a mutually agreeable point or points on the existing line
of United in the Biscuit Bayou Field Area, Terrebonne Parish,
Louisiana.
J. At a mutually agreeable point or points on the existing field
line of Enbridge Pipelines (Midla), L.L.C. (formerly known as
Mid Louisiana) in the Holly Ridge Field Area, Tensas Parish,
Louisiana.
K. At the outlet of the existing Cameron Meadows Plant of Mobil
Oil Corporation in Cameron Parish, Louisiana.
2. Enbridge Pipelines (Midla), L.L.C. (formerly known as Mid Louisiana)
shall install, maintain and operate the necessary metering,
regulating and connecting pipeline facilities at the Hammond Highway
delivery point (Item E above), and United shall install a tap on its
pipeline.
2. (a) Enbridge Pipelines (Midla), L.L.C. (formerly known as Mid Louisiana)
shall install, maintain, and operate the necessary metering,
regulating, and connecting pipeline facilities at the College Point
exchange location (Item G above), and United shall install a tap on
its pipeline.
2. (b) The metering, regulating and connecting facilities required at the
exchange points in the Palmetto Bayou Field Area (Item H) and in the
Biscuit Bayou Field Area (Item 1) shall be installed, maintained and
operated by Enbridge Pipelines (Midla), L.L.C. (formerly known as
Mid Louisiana), or others on its behalf.
The metering, regulating and connecting facilities required at the
exchange point or points in the Holly Ridge Field Area (Item J)
shall be installed, maintained and operated by United.
The metering and regulating at the Cameron Meadows Plant exchange
point (Item K) shall be done by United through its existing
facilities.