Enbriidge Pipelines (Midla) L. L. C.
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP09-624-000, Status: Effective
Second Revised Sheet No. 188A Second Revised Sheet No. 188A
Superseding: Substitute First Revised Sheet No. 188A
(b) To the extent that Pipeline elects to provide service pursuant to
this FERC Gas Tariff at a discounted rate, transportation rate
components shall be discounted in the following order:
1) The Reservation component, as applicable, shall be the first
component discounted and shall be the only component discounted
until such component has been reduced to the level established as
the Minimum Rate set forth on Sheet No. 4 of this FERC Gas Tariff;
but, in no case, shall Pipeline discount to a level which would
allow the Reservation component to equate to less than a Minimum
Rate specified by Pipeline on Sheet No. 4 of this FERC Gas Tariff.
2) The Commodity component shall be the next component discounted and
it shall be discounted until such component has been reduced to
the level established as Minimum Rate set forth on Sheet No. 4 or
4a as applicable, of this FERC Gas Tariff; but, in no case, shall
Pipeline discount to a level which would allow the Commodity
component to equate to less than the Minimum Rate specified by
Pipeline on Sheet No. 4 or 4a of this FERC Gas Tariff.
3) Discounts cannot be granted on the ACA Unit Rate.