Enbriidge Pipelines (Midla) L. L. C.
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2009, Docket: RP09-980-000, Status: Effective
Original Sheet No. 116A Original Sheet No. 116A
(l) In the event of an intraday capacity recall, the Transporter
shall determine the allocation of capacity between the
Releasing Customer and the Replacement Customer(s) based
upon the Elapsed Prorata Capacity (EPC). Variations to the
use of EPC may be necessary to reflect the nature of the
Transporter's Tariff, services and/or operational
characteristics.
4.5 Recalls of capacity
A Releasing Customer may recall capacity released to a Replacement
Customer, as negotiated in accordance with Paragraph 4.6(e)
hereof, providing that the Releasing Customer provides to Pipeline
and Replacement Customer Notice of such recall in accordance with
Section 15.1(i)(E).