Elba Express Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2010, Docket: RP10-342-000, Status: Effective
Original Sheet No. 51 Original Sheet No. 51
13. DETERMINATION OF RECEIPTS AND DELIVERIES
13.1 Receipt Point Allocation:
(a) PDA Requirement: If gas other than the gas transported for
SHIPPER is measured by COMPANY'S meter at a Receipt Point,
SHIPPER agrees to provide, or cause to be provided, to
COMPANY as set forth herein a predetermined allocation
("PDA") statement from its Point Operator(s) setting forth
the information described herein for the purpose of
determining the quantity of gas to be received by COMPANY
for the account of SHIPPER at the Receipt Point for the
Day(s) of transportation for which SHIPPER has made its
nomination(s). However, anything else in this Section 13 to
the contrary notwithstanding, if the Receipt Point is
covered by an Operational Balancing Agreement as described
in Section 13.3 of these GT&C, allocation of the receipt of
gas shall be governed by the Operational Balancing Agreement
before any allocation is made under the PDA.
(b) PDA Methods: The predetermined allocation statements
provided for each Receipt Point on COMPANY'S system to be
covered by a PDA shall include:
1.1 Percentage PDA;
1.2 Pro rata PDA;
1.3 Ranked PDA;
1.4 Swing PDA; or
1.5 Any other mutually agreeable allocation methodology.