(c) The flowing temperature of the gas shall be determined for
the purpose of measured volume correction. Volume shall be
corrected for each degree of variation in the flowing
temperature from 60 degrees Fahrenheit. The flowing
temperature will be measured by RTD's, thermocouples,
thermometers, etc. and shall be either (1) recorded using
digital recorders or (2) used for on-site flow computations
in electronic flow computers in which case the instantaneous
measurement of temperature will be used in such
computations.
(d) A specific gravity correction shall be applied to measured
volumes. The specific gravity to be used for such
correction shall be determined at an appropriate location by
a gravitometer, chromatograph or other device of standard
manufacture and shall be either (1) recorded using digital
recorders or (2) used for on-site flow computations in
electronic flow computers in which case the value of the
specific gravity being measured will be used as appropriate
in such computations.
(e) The gross heating value shall be determined at an
appropriate location, by a calorimeter, chromatograph or
other device of standard manufacture and shall be either (1)
recorded using digital recorders or (2) entered as an input
to electronic flow computers in which case the gross heating
value being measured will be used in the computation of the
Btu content of the gas.
5. MEASURING EQUIPMENT
5.1 COMPANY'S Measuring Equipment:
Gas delivered to COMPANY and by COMPANY to or for the account of
SHIPPER shall be measured by meters installed, operated, and
maintained by COMPANY, or such meters as COMPANY causes to be
installed, operated, and maintained, equipped to record daily and
hourly deliveries. Measurement data may be recorded using
electronic recorders or instantaneous flow computations in
electronic flow computers. Orifice meter installations shall
conform to the recommendations for design and installation
contained in AGA Report No. 3, as revised September 1985, and as
such report may hereafter be further revised. Turbine meter
installations shall conform to the recommendations for design and
installation contained in Gas Measurement Committee Report No. 7
of the AGA, as published in 1981 and as such report may be further
revised.