K N Interstate Gas Transmission Co.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1996, Docket: RP96-296-000, Status: Effective
Original Sheet No. 105 Original Sheet No. 105 : Superseded
RATE SCHEDULE FSS - continued
Same day service
Shipper(s) shall submit a nomination through the
electronic bulletin board by 11:00 a.m. CT the day
the Shipper desires service. Transporter shall
have no obligation to transport gas for Shipper
under this Rate Schedule if Shipper's nomination
is not timely. Same day service nominations will
be accepted at "qualified points" only. Same day
service nominations must be for a verifiable
physical increase or decrease in the flow of gas.
Nominations to redistribute nominated volumes
(contract switches) must have KNI's approval
before acceptance. Same day service nominations
are subject to all KNI confirmation procedures.
Shippers are responsible to "pre-confirm" same day
service nominations before submittal to KNI, so
that all confirming parties should be aware of the
transaction.
A same day service nomination will not be accepted
if it would curtail gas that is already flowing,
regardless of its rate schedule. Same day service
nominations cannot cause a Shipper to exceed its
MDTQ. The criteria for a point to qualify as a
"Qualified Point" are set out below and are posted
on the EBB. Specific points shall also be listed
on the EBB. The criteria are:
(1) Electronic flow measurement availability with
communication capability to KNI measurement
system.
(2) Location capable of flow adjustment
verifiable by KNI and operator
(3) 24 hour telephone contact for operator