K N Interstate Gas Transmission Co.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1996, Docket: RP96-296-000, Status: Effective
Original Sheet No. 48 Original Sheet No. 48 : Superseded
RATE SCHEDULE IT - continued
Same day service
Shipper(s) shall submit a nomination through the
electronic bulletin board by 11:00 a.m. CT the day
the Shipper desires service. Transporter shall
have no obligation to transport gas for Shipper
under this Rate Schedule if Shipper's nomination
is not timely. Same day service nominations will
be accepted at "qualified points" only. Same day
service nominations must be for a verifiable
physical increase or decrease in the flow of gas.
Nominations to redistribute nominated volumes
(contract switches) must have KNI's approval
before acceptance. Same day service nominations
are subject to all KNI confirmation procedures.
Shippers are responsible to "pre-confirm" same day
service nominations before submittal to KNI, so
that all confirming. Parties should be aware of
the transaction. A same day service nomination
will not be accepted if it would curtail gas that
is already flowing, regardless of its rate
schedule. Same day service nominations cannot
cause a Shipper to exceed its MDTQ. The criteria
for a point to qualify as a "Qualified Point" are
set out below and are posted on the EBB. Specific
points shall also be listed on the EBB. The
criteria are:
(1) Electronic flow measurement availability with
communication capability to KNI measurement
system.