K N Interstate Gas Transmission Co.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/1997, Docket: RP97- 81-000, Status: Effective
First Revised Sheet No. 15 First Revised Sheet No. 15 : Superseded
Superseding: Original Sheet No. 15
RATE SCHEDULE FT - continued
5. RATES
5.1 RATES. The applicable rates, including any
surcharges, for firm transportation service are
set forth in effective Sheet No. 4 of Volume 1-A
of this FERC Gas Tariff, as revised from time to
time. Unless otherwise agreed in writing between
Transporter and Shipper under Section 36 of the
General Terms and Conditions, the applicable
rate shall not be in excess of the maximum rate
nor less than the minimum rate.
5.2 MONTHLY BILL. Commencing for the month in which
the FT Service Agreement is effective and each
month thereafter, Transporter shall charge and
Shipper shall pay Transporter the sum of the
following amounts:
a. RESERVATION CHARGE. The reservation charge
shall be the product of:
(1) the Maximum Reservation Rate as stated
on Sheet Nos. 4 for each Primary Path,
unless otherwise agreed to in writing;
provided, if Shipper nominates Secondary
Receipt and/or Delivery Points and the
Maximum Reservation Rate of the path
nominated is greater than the Maximum
Reservation Rate of the primary path,
Shipper will be billed the difference
in the Maximum Reservation Rates for the
applicable period and quantities, unless
otherwise agreed to in writing; and
(2) the MDDQ specified by Primary Path in
Shipper's FT Service Agreement.
b. COMMODITY CHARGE. The commodity rate
multiplied by the volume in MMBTU of gas
delivered by Transporter during the month at
the Point(s) of Delivery.