Sabine Pipe Line Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/31/1993, Docket: RS92- 78-003, Status: Effective

Original Sheet No. 263 Original Sheet No. 263 : Superseded

 

 

Maximum Daily

Reservation Quantity

8. Primary Receipt Point(s): MMBtu

 

______________________________ __________

 

______________________________ __________

 

______________________________ __________

 

______________________________ __________

 

 

Maximum Daily

Reservation Quantity

9. Primary Delivery Point(s): MMBtu

 

______________________________ __________

 

______________________________ __________

 

______________________________ __________

 

______________________________ __________

 

 

10. Reservation Rate Bid:

 

Reservation Rate $ __________/MMBtu

 

or

 

Volumetric Rate $ __________/MMBtu

 

Calculated on the basis of the 100% load factor

derivative of the Maximum Reservation Rate.

 

 

11. Contingent Bid and Conditions:

 

_______________________________________________________

 

_______________________________________________________