NorAm Gas Transmission Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/1997, Docket: RP97- 61-002, Status: Effective
Second Revised Sheet No. 286 Second Revised Sheet No. 286 : Superseded
Superseding: First Revised Sheet No. 286
GENERAL TERMS AND CONDITIONS
(continued)
(e) Releasing Shipper and any replacement Shipper
must track any changes in Transporter's rates
approved by the Commission. If the
Commission orders refunds of any such rates
charged by Transporter subject to refund,
Transporter and/or releasing Shipper, as the
case may be, must make corresponding refunds
to such releasing Shipper or any replacement
Shipper, to the extent that releasing Shipper
or replacement Shipper(s) has paid amounts in
excess of Transporter's finally determined
applicable maximum rates.
(f) A releasing Shipper may re-release to the
same replacement Shipper for a term of
thirty-one (31) Days or less at rates less
than the applicable maximum rates if either:
1) a period of twenty-eight (28) Days has
elapsed after the first release for thirty-
one (31) Days or less has expired or 2) the
releasing Shipper causes the posting of an
offer to release capacity or of a pre-
arranged transaction to be made, and capacity
is allocated on the basis of bids submitted.
A releasing Shipper may also re-release
(without a twenty-eight Day waiting period)
to the same replacement Shipper for any term
at maximum rates. Otherwise, an agreement for
capacity to be released at less than maximum
rates for a term of thirty-one (31) Days or
less shall not contain an evergreen provision
and may not be rolled-over for any additional
time period.
(g) If the releasing Shipper retains recall
rights, it shall specify the condition(s)
precedent to such recall and any recall must
be for a period of one or more Day(s). The
releasing Shipper shall be responsible for
providing notice to Transporter as specified
in this sub-section and the replacement
Shipper(s) of its exercise of the recall
rights. No later than 8:00 a.m. on the Day
nominations are due for the first Day of the
recall period, the releasing Shipper must
communicate its intent to recall capacity to