Effective Date: 05/04/1995, Docket: RP95-306-000, Status: Effective

Second Revised Sheet No. 156 Second Revised Sheet No. 156 : Superseded

Superseding: Substitute First Revised Sheet No. 156

GENERAL TERMS AND CONDITIONS

----------------------------

 

(f) The Releasing Shipper may withdraw its posted

Capacity Release Request during an open season under this Section 16

only if the Releasing Shipper has a need for the capacity for its

own use not anticipated at the time of its Capacity Release Request;

following the close of the open season, a Releasing Shipper may not

reject a winning Qualified Bid. Notice of a withdrawal of a

Capacity Release Request must be delivered to Stingray's DART system

(or in writing for posting on Stingray's DART system if Stingray's

system is unavailable for receiving Capacity Release Requests) no

later than the end of the open season for the Capacity Release

Request.

 

(g) Unless the Capacity Release Request states

otherwise, the average monthly transportation flow used to evaluate

a Qualified Bid whose revenues will vary by the volume transported

shall be ten percent (10%) of the Qualified Bid capacity.

 

(h) Any Capacity Release Request not in compliance with

this Section 16.5 and the other provisions of Stingray's Tariff

shall be null and void and, even if posted, may be removed from

Stingray's DART system by Stingray at any time.

 

16.6 OPEN SEASON EXCEPTIONS

 

An open season is not required for: (a) a Prearranged

Release for the maximum reservation charge applicable to the

capacity being released; or (b) a Short-term Prearranged Release. A

Capacity Release Request which is not subject to an open season need

only contain the information required in Sections 16.4(a) and (b).

Such Capacity Release Request must be delivered to Stingray's DART

system (or in writing for posting on Stingray's DART system if

Stingray's DART system is unavailable for receiving Capacity Release

Requests) sufficiently in advance so that the release may become

effective under Section 16.9 before the release transaction is to

commence. In the case of releases for which service is to commence

on the first day of a month on or before May 22, 1995, the Capacity

Release Request should be submitted no later than 11:00 a.m. Central

Time two (2) business days prior to the day nominations are due

under Section 6.2 of these General Terms and Conditions for first of

the month service. A Releasing Shipper may not rollover, extend or

in any way continue a Short-term Prearranged Release with the same

Replacement or Subreplacement Shipper until twenty-eight (28) days

after the Short-term Prearranged Release has ended unless the

Releasing Shipper complies with the Capacity Release Request

provisions in Sections 16.3 and 16.4.