GENERAL TERMS AND CONDITIONS
----------------------------
any surcharges such as ACA, and the projected incremental volumes
which will result from the project.
4.2 OBLIGATION
Stingray's maximum obligation to receive gas at the
Receipt Point(s) under the Agreement shall never exceed the lesser
of: (a) the applicable MDQ under the Agreement in the aggregate or
at individual points, as specified in the Agreement or as applicable
at such point under this Tariff; or (b) the total daily volume
Shipper or its designee is able and willing to tender at the Receipt
Point(s).
4.3 LOCATION
Unless otherwise described in the Agreement, the Receipt
Point(s) for transportation Agreements shall be located at the
interconnection between the facilities of Shipper, or its designee,
and the facilities of Stingray.