Stingray Pipeline Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/01/2002, Docket: RP00-620-002, Status: Effective

Second Revised Sheet No. 69 Second Revised Sheet No. 69 : Effective

Superseding: First Revised Sheet No. 69

 

RATE SCHEDULE FTS-2

FIRM TRANSPORTATION SERVICE

 

7.2 Except as provided in the last sentence of this

Section 7.2, if, over any consecutive ninety

(90) day period during which Stingray's

pipeline is not fully subscribed on a firm

basis, Shipper ships through Stingray's

Facilities a quantity of natural gas in excess

of 120% of the sum of Shipper's applicable MDQs

for each day of the ninety (90) day period then

Stingray shall have the right to require

Shipper to make an election to increase its

quarterly MDQs for the balance of the Contract

Year by: (a) a quantity equal to the

percentage increase in actual shipments under

its FTS-2 Agreement for such ninety (90) day

period over the sum of Shipper's applicable

MDQs for each day of the ninety (90) day

period, or (b) a quantity equal to the

difference between the quantity actually

shipped by Shipper under its FTS-2 Agreement

during said ninety (90) day period and the sum

of Shipper's applicable MDQs for each day of

such ninety (90) day period. Shipper shall be

required to make its election upon receipt of

Stingray's notice provided in accordance with

Section 25 of the General Terms and Conditions

of this Tariff. Notice of Shipper's election

shall be provided to Stingray in accordance

with Section 25 of the General Terms and

Conditions of this Tariff the next Day

following receipt of Stingray's notice and the

increase shall become effective on the first

Day of the Contract Quarter next following

Stingray's notice to Shipper. The increase

shall remain in effect for the balance of the

Contract Year. In the event that Shipper fails

to make a timely election following receipt of

Stingray's notice, Shipper shall be deemed to

have elected to increase its MDQs in accordance

with the methodology set forth in (a) above.

This Section 7.2 shall not apply during the

first and second Contract Quarters of the first

Contract Year of service under Shipper's FTS-2

Agreement.

 

7.3 Except for Authorized Overrun Service, Shipper

shall pay Stingray an Unauthorized Overrun

Charge of $10 per Dth if gas tendered to

Stingray or deliveries to Shipper under an FTS-

2 Agreement exceed the MDQ under such FTS-2

Agreement during times an Operational Flow

Order has been issued pursuant to Section 10 of

the General Terms and Conditions. Any

Unauthorized Overrun Charges collected

hereunder shall be credited to Compliant

Shippers pursuant to Section 10 of the General

Terms and Conditions.

 

8. RATES AND CHARGES

 

8.1 The applicable maximum and minimum rates for

service under this Rate Schedule FTS-2 are set

forth on the currently effective Sheet No. 5 of

this Tariff and are incorporated herein by

reference.