RATE SCHEDULE FTS-2
FIRM TRANSPORTATION SERVICE
7.2 Except as provided in the last sentence of this
Section 7.2, if, over any consecutive ninety
(90) day period during which Stingray's
pipeline is not fully subscribed on a firm
basis, Shipper ships through Stingray's
Facilities a quantity of natural gas in excess
of 120% of the sum of Shipper's applicable MDQs
for each day of the ninety (90) day period then
Stingray shall have the right to require
Shipper to make an election to increase its
quarterly MDQs for the balance of the Contract
Year by: (a) a quantity equal to the
percentage increase in actual shipments under
its FTS-2 Agreement for such ninety (90) day
period over the sum of Shipper's applicable
MDQs for each day of the ninety (90) day
period, or (b) a quantity equal to the
difference between the quantity actually
shipped by Shipper under its FTS-2 Agreement
during said ninety (90) day period and the sum
of Shipper's applicable MDQs for each day of
such ninety (90) day period. Shipper shall be
required to make its election upon receipt of
Stingray's notice provided in accordance with
Section 25 of the General Terms and Conditions
of this Tariff. Notice of Shipper's election
shall be provided to Stingray in accordance
with Section 25 of the General Terms and
Conditions of this Tariff the next Day
following receipt of Stingray's notice and the
increase shall become effective on the first
Day of the Contract Quarter next following
Stingray's notice to Shipper. The increase
shall remain in effect for the balance of the
Contract Year. In the event that Shipper fails
to make a timely election following receipt of
Stingray's notice, Shipper shall be deemed to
have elected to increase its MDQs in accordance
with the methodology set forth in (a) above.
This Section 7.2 shall not apply during the
first and second Contract Quarters of the first
Contract Year of service under Shipper's FTS-2
Agreement.
7.3 Except for Authorized Overrun Service, Shipper
shall pay Stingray an Unauthorized Overrun
Charge of $10 per Dth if gas tendered to
Stingray or deliveries to Shipper under an FTS-
2 Agreement exceed the MDQ under such FTS-2
Agreement during times an Operational Flow
Order has been issued pursuant to Section 10 of
the General Terms and Conditions. Any
Unauthorized Overrun Charges collected
hereunder shall be credited to Compliant
Shippers pursuant to Section 10 of the General
Terms and Conditions.
8. RATES AND CHARGES
8.1 The applicable maximum and minimum rates for
service under this Rate Schedule FTS-2 are set
forth on the currently effective Sheet No. 5 of
this Tariff and are incorporated herein by
reference.