U-T Offshore System, L.L.C.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-146-001, Status: Effective
Second Revised Sheet No. 45 Second Revised Sheet No. 45 : Superseded
Superseding: First Revised Sheet No. 45
GENERAL TERMS AND CONDITIONS
(Continued)
5. CREDITWORTHINESS
U-TOS shall not be required to perform or to continue to perform service under Rate
Schedules FT and IT on behalf of any Shipper who is or has become insolvent, or who,
at U-TOS' request, fails within a reasonable period to demonstrate in U-TOS' reasonable
determination, the ability to pay all anticipated transportation charges when due for
at least three (3) months from the time of demonstration; provided, however, such
Shipper may receive service under Rate Schedules FT and IT if Shipper prepays for such
service or furnishes good and sufficient security as determined by U-TOS in its
reasonable discretion, in an amount equal to the cost of performing the service
requested by Shipper for a three month period, such cost to be determined by
multiplying the Shipper's MDQ by the number of days in such three month period
multiplied by the applicable rate per Dth, as set forth on Sheet No. 4 to U-TOS'
F.E.R.C Gas Tariff, Third Revised Volume No. 1. Also refer to Section 2.2(k) and 10.2
of these General Terms and Conditions.
6. RECEIPT AND DELIVERY
6.1 Points of Receipt. The Points of Receipt hereunder shall be the points of
connection between the facilities of U-TOS and the facilities of Shippers or
others at the points on the System where Shippers deliver, or cause to be
delivered, Gas to U-TOS for transportation service. U-TOS will make all Points
of Receipt available to all Shippers, either as Primary Points of Receipt or as
Secondary Points of Receipt, as defined in subsections 6.2 and 6.3 of this
Section 6.
6.2 Primary Points of Receipt. Primary Points of Receipt are those points set forth
on Exhibit A of the Transportation Agreement for which an MDV is stated.
6.3 Secondary Points of Receipt. Secondary Points of Receipt are all Points of
Receipt on U-TOS' System other than Primary Points of Receipt, as defined in
subsection 6.2 of this Section 6.
6.4 Changes in Primary Points of Receipt or in MDV. An FT or IT Shipper shall from
time to time notify U-TOS in writing of its desire for an additional Primary
Point of Receipt or for a change in the MDV at an existing Primary Point of
Receipt and shall furnish in this connection such deliverability, quality and
other relevant information as requested by U-TOS. Such request for change
shall be subject to the capacity provisions described in Sections 3 and 4 of the
Preliminary Statement and U-TOS shall have fifteen (15) days from receipt of
Shipper's written request to evaluate the change with respect to capacity
availability. To the extent capacity is available at the desired receipt point,
such capacity shall be available within one (1) business day after the fifteen
(15) day evaluation period. Exhibit A of the Transportation Agreement shall be
amended and executed by the parties to reflect the authorized change; provided,
however, that the requested changes or additions in the MDV at such Points of
Receipt shall not result in the sum of the MDV at each Point of Receipt in
Exhibit A to exceed the MDQ of such Shipper.
6.5 Receipt Point Priority. The priority for use of Primary Points of Receipt and
Secondary Points of Receipt is set forth in subsection 7.9 of Section 7,
Scheduling Requirements.