Pinnacle Pipeline Company
ORIGINAL VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/08/2003, Docket: RP04-102-001, Status: Effective
Original Sheet No. 156 Original Sheet No. 156 : Effective
25. NORTH AMERICAN ENERGY STANDARDS BOARD (NAESB) STANDARDS
Transporter hereby incorporates into this Tariff by
reference the following NAESB business standards of
Version 1.6 that are required by the Commission in 18
CFR Part 284.12(a), in accordance with Order Nos. 587,
et seq.:
0.3.1, 1.2.1 through 1.2.5, 1.2.8 through 1.2.11,
1.2.13 through 1.2.19, 1.3.2(vi), 1.3.3 through 1.3.9,
1.3.11, 1.3.13 through 1.3.78, 1.3.79, 1.4.1 through
1.4.7, 2.2.1 through 2.2.3, 2.3.1 through 2.3.6, 2.3.8
through 2.3.13, 2.3.15, 2.3.17 through 2.3.25, 2.3.27,
2.3.28 through 2.3.39, 2.3.42 through 2.3.44, 2.3.48,
2.3.50, 2.4.1 through 2.4.16, 3.3.1 through 3.3.14,
3.3.16 through 3.3.26, 3.4.1 through 3.4.4, 4.2.1
through 4.2.20, 4.3.1 through 4.3.76, 4.3.78 through
4.3.88, 5.2.1, 5.2.2, 5.3.3, 5.3.7 through 5.3.10,
5.3.12, 5.3.17, 5.3.18, 5.3.20 through 5.3.43, 5.4.1
through 5.4.22 and standards contained in
Recommendations R02002 (Standards 5.3.44 through
5.3.54) and R02002-2 (Standards 5.2.3 and 5.3.55
through 5.3.58).
In addition, Transporter hereby incorporates into this
Tariff by reference the model Operational Balancing
Agreement approved by NAESB as Standards 6.5.2.
26. DEFAULTS AND REMEDIES
26.1 Events of Default - An "Event of Default" shall
mean, with respect to Shipper or Transporter, the
occurrence of any of the following:
(a) any representation or warranty made in the
Agreement by Shipper or Transporter that
proves to be false or misleading in any
material respect;
(b) the failure of Shipper or Transporter to
perform any covenant set forth in a
Transportation Agreement, where such
failure is not excused by Force Majeure and
is not cured within thirty (30) Business
Days after written notice thereof to the
other party; or