Kansas Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/1999, Docket: CP96-152-023, Status: Effective
Second Revised Sheet No. 223 Second Revised Sheet No. 223 : Effective
Superseding: Sub First Revised Sheet No. 223
GENERAL TERMS AND CONDITIONS (Continued)
8.3 Shippers shall cause the Operator of each Point of
Receipt and each Point of Delivery designated in any
nomination pursuant to the GISB standards as referenced
on Tariff Sheet No. 289 to confirm all such
nominations or changes to nominations to Kansas Pipeline
in writing, by facsimile transmission or via the IEC as
provided for in this Section 8, prior to implementation
by Kansas Pipeline.
8.4(a) Kansas Pipeline will accept one pre-determined allocation
(PDA) methodology per allocation period. The upstream or
downstream party providing the point confirmation will
submit the PDA to the allocating party after or during
the confirmation and before the start of the gas day.
The types of Allocation Methodologies is a list from
which two (2) parties may agree. If the two (2) parties
cannot agree upon an allocation methodology, pro rata based
upon confirmed nominations should be used as the default
method. The party responsible for custody transfer (the
party performing the measurement function) should provide
the allocation.
(b) Changes to the daily allocation methodology may be
made during the Month. Such changes must be submitted
one Day in advance of the effective date and shall be
effective prospectively. No retroactive reallocations
of any transactions shall be permitted.