Kansas Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/1999, Docket: TM00-1-166-000, Status: Effective
2nd Sub Second Revised Sheet No. 28 2nd Sub Second Revised Sheet No. 28 : Effective
Superseding: Substitute Second Revised Sheet No. 28
CURRENTLY EFFECTIVE RATES
RATE SCHEDULE SCT
INTERRUPTIBLE TRANSPORTATION SERVICE
Each rate set forth on this tariff sheet is the currently effective rate
pertaining to the particular rate schedule to which it is referenced,
but each such rate is separate and independent and the change in any
such rate shall not thereby effect a change in any other rate schedule.
Fuel
Commodity Minimum Authorized Reimbursement *
Charge Rate Overrun Nov-Mar Apr-Oct
Zone 1 $0.4394 $0.0547 $0.4394 1.5751% 1.2500%
Zone 2 $0.5612 $0.0041 $0.5612 0.0000% 0.0000%
Zone 3 $0.7031 $0.0037 $0.7031 0.0000% 0.0000%
*Compressor fuel, lost and unaccounted for gas
Rates are additive. A Shipper transporting gas through more than one
Zone shall pay the applicable rates for each Zone.
The rates for Zone 1, as shown herein, include the Transok Lease costs
authorized by the Commission in KansOk Docket No. PR94-3-000. Shipper shall
pay Kansas Pipeline the actual transportation costs incurred by Kansas
Pipeline under the terms of the Transok Lease to deliver gas from specific
Receipt Point(s) nominated by such Shipper on Transok's system. See Section
15.1 of the General Terms and Conditions for an explanation and example
of how the Transok Lease annual minimum cost is calculated. Actual costs
are calculated on a per dekatherm basis pursuant to rates set forth in the
Lease by specific receipt point. Shipper shall reimburse Kansas Pipeline
for actual costs incurred by the pipeline in excess of the costs reflected
in the Zone 1 rate.