Kansas Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/27/2000, Docket: RP00-429-002, Status: Effective
Sub Fifth Revised Sheet No. 21 Sub Fifth Revised Sheet No. 21 : Effective
Superseding: 2nd Sub Third Revised Sheet No. 21
CURRENTLY EFFECTIVE RATES
RATE SCHEDULE FT-NN
NO NOTICE FIRM TRANSPORTATION SERVICE
Each rate set forth on this tariff sheet is the currently
effective rate pertaining to the particular rate schedule to
which it is referenced, but each such rate is separate and
independent and the change in any such rate shall not thereby
effect a change in any other rate schedule.
Fuel
Reservat. Commodity Minimum Auth. Reimbursement*
Charge Charge Rate Overrun Nov-Mar Apr-Oct
Zone 1 $4.6785 $0.0547 $0.0547 $0.2086 1.5751% 1.2500%
Zone 2 $6.7776 $0.0041 $0.0041 $0.2270 0.0000% 0.0000%
Zone 3 $8.5088 $0.0037 $0.0037 $0.2836 0.0000% 0.0000%
*Compressor fuel, lost and unaccounted for gas.
Rates are additive. A Shipper transporting gas through more
than one Zone shall pay the applicable rates for each Zone.
Volumetric firm capacity release maximum rate per dth stated at
100% load factor (exclusive of any surcharges):
Zone 1 Zone 2 Zone 3
$0.1538 $0.2228 $0.2797
Rates applicable for released capacity with a term of less than
one year may exceed the posted maximum tariff rate for a period
of time, to expire at 9:00 Central Clock Time on September 30, 2002
or such later date as the Commission may order.
The rates for Zone 1, as shown herein, include the Transok Lease costs
authorized by the Commission in KansOk Docket No. PR94-3-000. Shipper
shall pay Kansas Pipeline the actual transportation costs incurred
by Kansas Pipeline under the terms of the Transok Lease to deliver
gas from specific Receipt Point(s) nominated by such Shipper on
Transok's system. See Section 15.1 of the General Terms and Conditions
for an explanation and example of how the Transok Lease annual minimum
cost is calculated. Actual costs are calculated on a per dekatherm
basis pursuant to rates set forth in the Lease by specific receipt
point. Shipper shall reimburse Kansas Pipeline for actual costs
incurred by the pipeline in excess of the costs reflected
in the Zone 1 rate.