Ozark Gas Transmission System

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/1993, Docket: RS92- 72-003, Status: Effective

First Revised Sheet No. 136 First Revised Sheet No. 136 : Superseded

Superseding: Original Sheet No. 136

 

RATE SCHEDULE ITS

INTERRUPTIBLE TRANSPORTATION SERVICE

(Continued)

 

lines of pipe; the necessity for testing

(as required by governmental authority or as deemed

necessary by the testing party for the safe

operation thereof); the necessity of making

repairs or alternations to machinery or lines

of pipe; failure of surface equipment of pipelines;

inability of either party hereto to obtain

necessary material, supplies, or permits, or

labor to perform or comply with any obligations

or condition of this ITS Rate Schedule or of the

ITS Agreement; inability to obtain rights-of-way;

compliance with tariff provisions of downstream

pipelines; and any other causes, whether of the kind

herein recited or not, which are not reasonably in

the control of the party claiming suspension.

 

8.3 Service under this ITS Rate Schedule may be

interrupted or curtailed for reasons of force

majeure or due to any other scheduled routine,

repair, and maintenance to be reasonably

determined by Transporter. Without limitation of

the foregoing, Transporter shall have the right

to equitably reduce receipts or deliveries of

natural gas on any day below the MDQ to permit

maintenance, repair, overhaul, replacement, or

construction of pipelines, compressors, metering,

regulating, or other production, gathering, and

transmission facilities and equipment or due to

facility maintenance or freeze offs.

 

8.4 In the event on any day Transporter is unable

to receive for transportation the total MDQ of any

Shipper receiving service under this ITS Rate

Schedule due to reasons of force majeure or any

other operational consideration to be reasonably

determined by Transporter, then the system

capacity which is available for transportation

shall be in accordance with the priorities set

out in this ITS Rate Schedule.