Ozark Gas Transmission System
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/22/1992, Docket: RP92-155-001, Status: Effective
Substitute Second Revised Sheet No. 126 Substitute Second Revised Sheet No. 126 : Superseded
Superseding: First Revised Sheet No. 126
RATE SCHEDULE ITS
INTERRUPTIBLE TRANSPORTATION SERVICE
(Continued)
time and at any time selectively adjust, on a
non-discriminatory basis, the rate to be charged
to any Shipper pursuant to Section 4.1. In addition,
Transporter may from time to time and at any time
selectively adjust, on a non-discriminatory basis,
the level of costs to be reimbursed by any Shipper
pursuant to Section 4.4(b) (provided that fuel costs
shall not be adjusted below the actual cost level),
or Section 4.4(c) (provided that such adjustments
shall not result in the allocation of costs to other
services). Any adjusted rate shall not exceed the
currently effective Maximum ITS Rate nor be less than
the currently effective Minimum ITS Rate. If Transporter
adjusts the rates charged to any Shipper under this
Section 4.2, Transporter shall file all required reports
with the Federal Energy Regulatory Commission.
The Maximum ITS Rate shall be adjusted each April 1
and October 1 to reflect changes in the demand
component of the Maximum ITS Rate. Thirty days prior
to each such adjustment, Transporter shall make an
informational filing with the FERC showing the deri-
vation of the updated Maximum ITS Rate. Such infor-
mational filing shall not constitute a change in rate
under Section 4 of the Natural Gas Act, and shall not
be made subject to suspension or refund.
4.3 Billing and payment procedures applicable to
transportation service pursuant to this Rate
Schedule are set forth in Section 6 of the
General Terms and Conditions of Transporter's
FERC Gas Tariff.
4.4 Shipper shall reimburse Transporter:
(a) For the costs, as determined under Section 2.4
of this ITS Rate Schedule, of facilities in-
stalled by Transporter with Shipper's consent
to receive, measure, transport and deliver
natural gas for the account of Shipper.
(b) For Fuel Usage and Applicable Shrinkage.
Shipper shall tender to Transporter, in
addition to volumes for delivery, an
additional volume of gas equal to three
percent (3%) of the quantity of gas received
by Transporter at each requested Point(s) of
Receipt.
(c) For any and all filing fees or other costs
incurred which are related to the specific
transaction and required in connection with
Shipper's ITS Agreement or by any applicable
regulation.
(d) For all charges incurred for scheduling
and/or delivery imbalances, as set forth in
Section 5 of this ITS Rate Schedule.