Ozark Gas Transmission System

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/22/1992, Docket: RP92-155-001, Status: Effective

Substitute Second Revised Sheet No. 126 Substitute Second Revised Sheet No. 126 : Superseded

Superseding: First Revised Sheet No. 126

 

RATE SCHEDULE ITS

INTERRUPTIBLE TRANSPORTATION SERVICE

(Continued)

 

time and at any time selectively adjust, on a

non-discriminatory basis, the rate to be charged

to any Shipper pursuant to Section 4.1. In addition,

Transporter may from time to time and at any time

selectively adjust, on a non-discriminatory basis,

the level of costs to be reimbursed by any Shipper

pursuant to Section 4.4(b) (provided that fuel costs

shall not be adjusted below the actual cost level),

or Section 4.4(c) (provided that such adjustments

shall not result in the allocation of costs to other

services). Any adjusted rate shall not exceed the

currently effective Maximum ITS Rate nor be less than

the currently effective Minimum ITS Rate. If Transporter

adjusts the rates charged to any Shipper under this

Section 4.2, Transporter shall file all required reports

with the Federal Energy Regulatory Commission.

 

The Maximum ITS Rate shall be adjusted each April 1

and October 1 to reflect changes in the demand

component of the Maximum ITS Rate. Thirty days prior

to each such adjustment, Transporter shall make an

informational filing with the FERC showing the deri-

vation of the updated Maximum ITS Rate. Such infor-

mational filing shall not constitute a change in rate

under Section 4 of the Natural Gas Act, and shall not

be made subject to suspension or refund.

 

4.3 Billing and payment procedures applicable to

transportation service pursuant to this Rate

Schedule are set forth in Section 6 of the

General Terms and Conditions of Transporter's

FERC Gas Tariff.

 

4.4 Shipper shall reimburse Transporter:

 

(a) For the costs, as determined under Section 2.4

of this ITS Rate Schedule, of facilities in-

stalled by Transporter with Shipper's consent

to receive, measure, transport and deliver

natural gas for the account of Shipper.

 

(b) For Fuel Usage and Applicable Shrinkage.

Shipper shall tender to Transporter, in

addition to volumes for delivery, an

additional volume of gas equal to three

percent (3%) of the quantity of gas received

by Transporter at each requested Point(s) of

Receipt.

 

(c) For any and all filing fees or other costs

incurred which are related to the specific

transaction and required in connection with

Shipper's ITS Agreement or by any applicable

regulation.

 

(d) For all charges incurred for scheduling

and/or delivery imbalances, as set forth in

Section 5 of this ITS Rate Schedule.