Ozark Gas Transmission System
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1993, Docket: RS92- 72-003, Status: Effective
First Revised Sheet No. 100 First Revised Sheet No. 100 : Superseded
Superseding: Original Sheet No. 100
RATE SCHEDULE FTS
FIRM TRANSPORTATION SERVICE
(Continued)
executed FTS Agreement; inability to obtain
rights-of-way; compliance with tariff provisions
of downstream pipelines; and any other causes,
whether of the kind herein recited or not, which
are not reasonably in the control of the party
claiming suspension.
8.3 Service under this FTS Rate Schedule may be
interrupted or curtailed for reasons of force
majeure or due to any other scheduled routine,
repair, and maintenance to be reasonably
determined by Transporter. Without limitation
of the foregoing, Transporter shall have the right
to equitably reduce receipts or deliveries of
natural gas on any day below the MDQ to permit
maintenance, repair, overhaul, replacement, or
construction of pipelines, compressors, metering,
regulating, or other production, gathering, and
transmission facilities and equipment or due to
facility maintenance or freeze offs.
8.4 In the event on any day Transporter is unable to
receive for transportation the total MDQ of any
Shipper receiving service under this FTS Rate
Schedule due to reasons of force majeure or any
other operational consideration to be reasonably
determined by Transporter, then the system
capacity which is available for transportation
shall be allocated pro rata based on MDQ.
9. RECEIPT AND DELIVERY PRESSURE
Transporter shall not be obligated to deliver natural
gas at the Point(s) of Delivery at a pressure in
excess of the delivery pressure specified in the FTS
Service Agreement. Transporter shall not be obligated
to reduce the existing level of pressure at any
Point(s) of Receipt in order to effectuate receipt of
natural gas.
10. LAWS AND REGULATIONS
10.1 This FTS Rate Schedule and the executed FTS
Agreement and the obligations of the parties