Ozark Gas Transmission System
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1998, Docket: RP98-283-000, Status: Effective
Third Revised Sheet No. 43B Third Revised Sheet No. 43B : Superseded
Superseding: Substitute Second Revised Sheet No. 43B
Standard 5.3.12: Bids and Offers should be complete before
being posted. Only posted offers and bids should be
available electronically.
Standard 5.3.18: System-wide notices should have a separate
category for notices that are not critical.
Standard 5.3.20: Capacity Release historical data should be
made available on a consistent basis from the transportation
service provider, which should provide for retrieval of open
and closed offers during the FERC archival period.
Standard 5.3.21: On the bidding formats, the number of
decimal places for offers, bids, and awards should be equal
to the (4) four decimal places in the stated rates per
Transporter's Rate Schedule FTS, Sheet No. 5.
Standard 5.3.22: For less than maximum rate transactions
only, converting daily rate to monthly rate is accomplished
by multiplying the daily rate times the number of days in
rate period, dividing the result by number of months in rate
period and taking the remainder out to 5 decimal places and
rounding up or down to the Transporter's specified decimal
place. Converting a monthly rate to a daily rate is
accomplished by multiplying the monthly rate times the number
of months in rate period; dividing the result by number of days
in rate period and taking the remainder out to 5 decimal places
and rounding up or down to the Transporter's specified decimal
place.
Standard 5.3.30: The Upload to Pipeline of Prearranged Deal
(UPPD) bidder confirmation and validation process will support
the association of a replacement capacity contract with another
contract for balancing or related purposes. The support for this
process between parties will be on a mutually agreeable basis.