Ozark Gas Transmission System
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1993, Docket: RS92- 72-003, Status: Effective
First Revised Sheet No. 30 First Revised Sheet No. 30 : Superseded
Superseding: Original Sheet No. 30
TRANSPORTATION SERVICE REQUEST FORM
(Continued)
8. Date service is proposed to commence:
Date service is proposed to terminate:
9. If additional or new facilities are required to
receive or deliver gas for the transportation
service requested herein, please provide descrip-
tion of facilities required, location, and
requested in-service date.
10. The Maximum Daily Quantity to be transported is
__________MMBtu and ___________ Mcf. The
estimated total quantity of gas to be transported
during the requested term of service is
__________ MMBtu and __________ Mcf.
11. Name and description of Receipt Point(s) into
Ozark's system and the maximum daily quantities
expressed in MMBtu and Mcf's of gas to be
delivered by Shipper for each point. Shipper may
indicate Master Receipt Point list.
(the sum of the maximum quantities above must
equal the maximum daily quantity in #10 above.)
12. Name and description of Delivery Point where
Ozark will redeliver the gas:
13. The names of those entities delivering gas into
Ozark's system and the names of those entities
taking gas off Ozark's system:
Ozark Receipt Point(s) Name/Delivering Entity
______________________ ______________________
______________________ ______________________
______________________ ______________________
______________________ ______________________
Ozark Delivery Point(s) Name/Taking Entity
_______________________ ______________________
_______________________ ______________________
_______________________ ______________________
_______________________ ______________________