Ozark Gas Transmission System

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index



Effective Date: 06/01/1997, Docket: RP97-179-002, Status: Effective

Second Revised Sheet No. 21C Second Revised Sheet No. 21C : Superseded

Superseding: First Revised Sheet No. 21C






A. __________________________________________________("Releasing

Shipper") is a firm Shipper or Replacement Shipper on Ozark

Gas Transmission System ("Transporter"). Releasing Shipper

proposes to release capacity as set forth below, and in

Transporter's FERC Gas Tariff. Releasing Shipper consents

to a partial assignment of capacity on Transporter, and will

remain liable on its transportation contract with Transporter

notwithstanding this release.


B. Rate schedule and contract number pursuant to which capacity

is released.

Contract Number: _________________.


C. Quantity of capacity to be released: Max _________Dth/day.

D. Term of release:___________________________________________.

i) Month/year beginning of release__________________.

ii) Month/year end of release________________________.

iii) Is the release a secondary release? ____________.


E. (i) Minimum transportation rate acceptable to Releasing Shipper

(if none, write "none"; includes commodity component):_____





(ii) Bid Requirements:


F. Receipt Points and Delivery points (designate primary and/or secondary):



G. Is the release subject to ___recall and/or ___reput?

If yes, terms and conditions of recall and/or reput:_________




H. Bid Evaluation Methodology: __ highest rate, __ net revenue

or __ present value