Ozark Gas Transmission System
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-179-002, Status: Effective
Second Revised Sheet No. 21C Second Revised Sheet No. 21C : Superseded
Superseding: First Revised Sheet No. 21C
14.11 NOTICE OF RELEASE OF FIRM CAPACITY
A. __________________________________________________("Releasing
Shipper") is a firm Shipper or Replacement Shipper on Ozark
Gas Transmission System ("Transporter"). Releasing Shipper
proposes to release capacity as set forth below, and in
Transporter's FERC Gas Tariff. Releasing Shipper consents
to a partial assignment of capacity on Transporter, and will
remain liable on its transportation contract with Transporter
notwithstanding this release.
B. Rate schedule and contract number pursuant to which capacity
is released.
Contract Number: _________________.
C. Quantity of capacity to be released: Max _________Dth/day.
D. Term of release:___________________________________________.
i) Month/year beginning of release__________________.
ii) Month/year end of release________________________.
iii) Is the release a secondary release? ____________.
E. (i) Minimum transportation rate acceptable to Releasing Shipper
(if none, write "none"; includes commodity component):_____
___________________________________________________________
___________________________________________________________
___________________________________________________________.
(ii) Bid Requirements:
F. Receipt Points and Delivery points (designate primary and/or secondary):
________________________________________________________.
G. Is the release subject to ___recall and/or ___reput?
If yes, terms and conditions of recall and/or reput:_________
_____________________________________________________________
_____________________________________________________________.
H. Bid Evaluation Methodology: __ highest rate, __ net revenue
or __ present value