Trunkline LNG Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/1989, Docket: CP87-418-001, Status: Effective
Original Sheet No.74 Original Sheet No.74 : Effective
RATE SCHEDULE PLNG-2 (Continued)
shall be made for those quantities delivered during the last
half of the period since the date of the last calibration.
(c) Devices for measuring the level of LNG and
temperature in the tanks of the LNG tankers, as well as
chromatographs used for the analysis of regasified LNG, shall
be devices offering the greatest reliability and the greatest
accuracy known at the time of selection. The installation and
operation of such equipment shall be carried out according to
the manufacturers' specifications.
12.9 All instruments and gauges used for computing the LNG
delivered hereunder shall be calibrated in the following
manner:
(a) Volume: in cubic meters (m3)
(b) Temperature: in degrees centigrade
(c) Pressure: on a dual scale calibrated in Bars
or millibars on one side and
pounds per square inch on the
other.
ARTICLE XIII
Measurement and Tests for Redelivery of Regasified LNG
Unless otherwise agreed upon by the parties, Pan National
shall cause the measurement of the quantities of regasified LNG
redelivered by TLC to be performed by Trunkline or other third
party transporter receiving such regasified LNG at the
Redelivery Point in accordance with such transporter's normal
-24-