Trunkline LNG Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/1989, Docket: CP87-418-001, Status: Effective
Original Sheet No. 73 Original Sheet No. 73 : Effective
RATE SCHEDULE PLNG-2 (Continued)
(c) Both parties shall have the right to inspect at
all times and be present at the calibration of the measuring
and testing equipment upon reasonable notice. All testing
data, charts, calculations or any other similar information
shall be made available to the parties and preserved for a
period of not less than 3 years.
12.8 (a) The accuracy of the instruments used shall be
verified at the request of either party. Such verifications
shall be made in the presence of the party requesting
verification, in accordance with methods recommended by the
manufacturers of the measuring instruments.
(b) If, at the time of verification, a measuring
instrument is found to result in errors of one percent or less
of unloaded LNG, such equipment's previous measurements shall
be considered accurate for purposes of delivery calculations
and such equipment shall be adjusted forthwith as necessary.
If, at the time of verification, a measuring instrument is
found to result in errors of more than one percent of LNG
unloaded, such equipment's previous measurements shall be
brought to a zero difference by comparison with calibration
results for any period known definitively or agreed to have
been affected by such error, and the calculation of deliveries
made during said period shall be corrected accordingly;
however, in the event that the period during which such error
occurred is not definitively known or agreed upon, corrections
-23-