Trunkline LNG Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/1989, Docket: CP87-418-001, Status: Effective
Original Sheet No. 70 Original Sheet No. 70 : Effective
RATE SCHEDULE PLNG-2 (Continued)
units approved by the U.S. Bureau of Standards in Washington
(D.C.) or corresponding national institution of the country in
which the LNG is loaded, as well as correction charts (list,
trim, tanks' contraction, etc.). Such standards and charts
shall be used throughout the term of this Agreement, except in
the case of a physical change in the tanks, in which case new
standards and charts shall be used. LNG level measuring
devices shall be approved by both TLC and Pan National. Each
tank shall be equipped with two level-measuring devices of
different types.
12.2 The density of the LNG shall be calculated using the
revised Klosek and McKinley method.
12.3 The temperature of the LNG contained in the tanks of
any LNG tanker shall be determined by using the arithmetic
average of the temperatures indicated by special thermo-couples
or resistance thermometers spaced at various locations from top
to bottom of each tank with an accuracy of plus or minus
two-tenths of a degree centigrade. Such temperatures shall be
either logged or printed.
12.4 Samples of the LNG shall be taken with a frequency
adequate to assure a representative analysis of the LNG being
unloaded, at a suitable point between the Discharge Point and
TLC's storage facilities. The sampling device shall be such as
to permit the total and continuous vaporization of a quantity
of LNG sufficient for the taking of a gaseous sample
representative of the LNG then being delivered. Such samples
-20-