Trunkline LNG Company

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/01/1989, Docket: CP87-418-001, Status: Effective

Original Sheet No. 68 Original Sheet No. 68 : Effective

 

 

RATE SCHEDULE PLNG-2 (Continued)

 

As soon as the LNG tanker is berthed alongside the

pier and prepared to unload its cargo, the Captain of the LNG

tanker shall give written notice of ready to discharge to TLC

or its representative at any time of the day or night. TLC

shall then take all appropriate measures within its reasonable

control to permit the unloading of the LNG tanker as quickly as

possible.

 

ARTICLE XI

Scheduling

 

11.1 TLC shall operate and maintain its facilities made

available hereunder at all times in a prudent manner consistent

with TLC's good faith interpretations of reasonable operating

and maintenance practices in the industry and all applicable

safety, environmental, and operating requirements of

governmental authorities. Pan National shall schedule and

provide for the delivery of LNG to TLC and the receipt of

regasified LNG from TLC in a manner consistent with the

operating capacity of TLC's facilities and the provisions of

section 3.2.

11.2 At least two days prior to the beginning of each

month, Pan National shall provide to TLC a schedule showing the

estimated unloadings of LNG and daily quantities of redelivery

of regasified LNG required hereunder by Pan National during

such month. Pan National shall give TLC prompt notice, orally

or in writing, of any changes of such schedule, which TLC shall

 

-18-