Trunkline LNG Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/1989, Docket: CP87-418-001, Status: Effective
Original Sheet No. 68 Original Sheet No. 68 : Effective
RATE SCHEDULE PLNG-2 (Continued)
As soon as the LNG tanker is berthed alongside the
pier and prepared to unload its cargo, the Captain of the LNG
tanker shall give written notice of ready to discharge to TLC
or its representative at any time of the day or night. TLC
shall then take all appropriate measures within its reasonable
control to permit the unloading of the LNG tanker as quickly as
possible.
ARTICLE XI
Scheduling
11.1 TLC shall operate and maintain its facilities made
available hereunder at all times in a prudent manner consistent
with TLC's good faith interpretations of reasonable operating
and maintenance practices in the industry and all applicable
safety, environmental, and operating requirements of
governmental authorities. Pan National shall schedule and
provide for the delivery of LNG to TLC and the receipt of
regasified LNG from TLC in a manner consistent with the
operating capacity of TLC's facilities and the provisions of
section 3.2.
11.2 At least two days prior to the beginning of each
month, Pan National shall provide to TLC a schedule showing the
estimated unloadings of LNG and daily quantities of redelivery
of regasified LNG required hereunder by Pan National during
such month. Pan National shall give TLC prompt notice, orally
or in writing, of any changes of such schedule, which TLC shall
-18-