Effective Date: 12/01/1989, Docket: CP87-418-001, Status: Effective
Original Sheet No. 67 Original Sheet No. 67 : Effective
RATE SCHEDULE PLNG-2 (Continued)
(v) a vapor return line from the LNG tanker to shore
facilities having a diameter sufficient to maintain
appropriate operating pressure in the tanks of the LNG
tanker and in the storage reservoirs; and
(vi) a liquid nitrogen loading facility compatible
with the LNG tankers.
10.3 Unloading of LNG shall be carried out in strict
conformity with all applicable safety and other similar
regulations.
10.4 Pan National shall give written notice to TLC of the
date and hour of arrival at the port of unloading of any LNG
tanker providing maritime transportation of LNG to be received
hereunder as well as of the estimated quantity of LNG which is
to be unloaded. Pan National shall send or cause to be sent to
TLC the following written designation notices:
(i) a first designation notice shall be given upon
departure from the port of loading, and shall contain an
estimated time of arrival;
(ii) a second designation notice shall be given so as
to arrive 72 hours prior to the estimated time of arrival;
(iii) a third designation notice shall be given so as
to arrive 24 hours prior to the estimated time of arrival;
and
(iv) a final designation notice shall be given so as
to arrive 5 hours prior to the estimated time of arrival at
the sea buoy or designated anchorage at the unloading port.