Trunkline Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/27/2000, Docket: RP00-369-001, Status: Effective
Sub Fourth Revised Sheet No. 190 Sub Fourth Revised Sheet No. 190 : Effective
Superseding: Sub Third Revised Sheet No. 190
GENERAL TERMS AND CONDITIONS
(Continued)
9. CAPACITY RELEASE (Continued)
(9) The minimum rate expressed in dollars and cents or
percentage of Maximum Tariff Rate, term, and quantity of
capacity Releasing Shipper shall accept, if any, and
whether bids using a volumetric rate for the collection
of Reservation or Capacity and Deliverability Charges
will be accepted and whether Releasing Shipper requires
a volumetric commitment. The maximum volumetric rate
that may be bid shall not exceed the one hundred percent
(100%) load factor equivalent of the maximum Reservation
or Capacity and Deliverability reservation rates;
provided, however, that the maximum volumetric rate
limitation shall not apply to a capacity release with a
term of less than one year until September 30, 2002. The
one hundred percent (100%) load factor equivalent for such
rates equals the overrun rate for the applicable service
being released as set forth on the effective rate tariff
sheets. Trunkline shall support volumetric releases with
volumetric commitments by fully accounting for volumetric
and reservation components, consistent with the rules and
regulations enunciated by the Commission. The maximum
reservation rate that may be bid shall not exceed the
Maximum Rate for the applicable service being released as
set forth on the applicable currently effective tariff
sheets;
(10) The duration of the posting which may not be less than
the minimum bid period specified in Section 9.4(B)
herein;
(11) The best bid criterion, the method by which volumetric
or contingent bids will be evaluated, and any alternate,
objective and nondiscriminatory method for breaking
ties. The best bid evaluation method established by
Releasing Shipper must be objectively stated, applicable
to all PRS or Replacement Shippers and not unduly
discriminatory and shall enable Trunkline to rank the
bids received by utilizing the weight assigned by
Releasing Shipper to each element of the Shipper Notice;
(12) If the release is for a period less than one Month, the
Releasing Shipper may designate in the Shipper Notice
the winning bid criterion to be the first acceptable bid
received. Such capacity release shall not contain an
evergreen provision and cannot be reassigned to the same
Replacement Shipper within twenty-eight (28) Gas Days from
the termination of each release, except in the event the