Trunkline Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/09/1997, Docket: RP97-186-000, Status: Effective
Third Revised Sheet No. 72 Third Revised Sheet No. 72 : Effective
Superseding: Second Revised Sheet No. 72
RATE SCHEDULE FSS (Continued)
FIRM STORAGE SERVICE
an amount less than the applicable Maximum Rate and not less than
the applicable Minimum Rate is agreed upon, such amount shall be
applied prospectively. Trunkline shall be responsible for
compliance with any reporting requirements prescribed by the
Commission. Trunkline shall not be required to enter into any
Service Agreement for Storage service at a rate less than the
Maximum Rate per Dt.
3.6 Overrun Charge
If during the Month, Shipper injects into storage or withdraws
from storage Quantities in excess of the MDIQ or MDWQ, as
applicable, stated in the Service Agreement for the service
provided hereunder, the applicable charge per Dt shall be the
product of such excess Quantities and the applicable overrun rate
as set forth on the effective Tariff Sheet No. 12. The Overrun
Charge will not apply to Winter Period injections and Summer
Period withdrawals if the Quantities injected or withdrawn are
within the MDIQ or MDWQ, as applicable.
3.7 Negotiated Rates
Shipper and Trunkline may agree, on a prospective basis, to a
Negotiated Rate with respect to the charges identified in Sections
3.1, 3.2, 3.3 and 3.4 herein which may be less than, equal to or
greater than the Maximum Rate; shall not be less than the Minimum
Rate; may be based on a rate design other than straight fixed
variable; and may include a minimum quantity. Such Negotiated
Rate shall be set forth on Exhibit A of the executed Service
Agreement and on the currently effective Tariff Sheet No. 19. The
Maximum Rate is available to any Shipper that does not choose a
Negotiated Rate.
Shippers paying a Negotiated Rate which exceeds the Maximum Rate
will be considered to be paying the Maximum Rate for purposes of
scheduling, curtailment and interruption, calculating the economic
value of a request for unsubscribed firm capacity, and matching
competing bids for the right of first refusal. Replacement
Shippers may not bid or pay a rate greater than the Maximum Rate
and are not eligible for Negotiated Rates.