Trunkline Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1993, Docket: RS92- 25-001, Status: Effective
Original Sheet No. 71 Original Sheet No. 71 : Effective
RATE SCHEDULE FSS (Continued)
FIRM STORAGE SERVICE
2.5 Cycling Requirement
If the Stored Volume of Shipper is not reduced to ten
percent (10%) of MCSC or less prior to April 1 of any
Contract Year, then Trunkline shall retain any Stored
Volume in excess of ten percent (10%) of the MCSC.
3. RATES
The rates and charges for firm service under this Rate
Schedule FSS shall be as follows:
3.1 Capacity Charge
The monthly Capacity Charge shall be the product of
1/12th the MCSC and the capacity rate per Dt as set
forth on the effective Tariff Sheet No. 12.
3.2 Deliverability Charge
The monthly Deliverability Charge shall be the product
of the MDWQ and the deliverability rate per Dt as set
forth on the effective Tariff Sheet No. 12.
3.3 Injection Charge
The Injection Charge shall be the product of the
Quantity of Gas actually received from Shipper and
injected into storage during the Month and the
injection rate per Dt as set forth on the effective
Tariff Sheet No. 12.
3.4 Withdrawal Charge
The Withdrawal Charge shall be the product of the
Quantity of Gas actually withdrawn from storage and
delivered to Shipper during the Month and the
withdrawal rate per Dt as set forth on the effective
Tariff Sheet No. 12.
3.5 Range of Rates
Unless otherwise agreed to in writing between Shipper
and Trunkline, any rate applicable to Shipper for
service hereunder shall be the applicable Maximum Rate
set forth on the effective Tariff Sheet No. 12, plus
all surcharges specified in the General Terms and
Conditions, as may be applicable from time to time. If